Beinn an Tuirc 2 wind farm

Beinn an Tuirc 2 is an onshore wind farm in Strathclyde, Scotland with 44 MW of registered capacity. In 2025 it generated 90.4 GWh, a load factor of 23%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since February 2019.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Beinn an Tuirc 2 since 2019: every month and year

Elexon's metered record for Beinn an Tuirc 2's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 757 GWh. Its busiest whole year was 2022, at a load factor of 29%. Its best day was 2 February 2021, when it generated 976 MWh, 41 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 44 MW. Hover over or tap a bar for the month’s figures.
Beinn an Tuirc 2's metered output by year
YearGeneratedLoad factor
2026to 24 Oct85.1 GWh27%
202590.4 GWh23%
2024108 GWh28%
202395.2 GWh25%
2022110 GWh29%
202190.2 GWh23%
202090.7 GWh24%
2019from 1 Feb87.2 GWh25%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, E_BTUIW-2, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Beinn an Tuirc 2

Beinn an Tuirc 2 is an onshore wind farm in Strathclyde, Scotland, with 44 MW of registered generating capacity across one balancing mechanism unit. It is the 109th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by ScottishPower. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Beinn an Tuirc 2 as operational since September 2014, with 19 turbines of 2.3 MW.

Beinn an Tuirc 2
Where Beinn an Tuirc 2 is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity44 MW
Turbines19 turbines of 2.3 MW
Operational sinceSeptember 2014
LocationStrathclyde, Scotland
Grid regionNorth Scotland
Owner groupScottishPower (operator or majority owner; joint ventures simplified)
Operator in REPDScottishPower Renewables
Elexon lead partySP Renewables (UK) Limited
BM unit E_BTUIW-2 44 MW
Size109th largest of 163

Download and cite

Beinn an Tuirc 2 daily output (CSV)

Every finished UK day GridMonkey has recorded for Beinn an Tuirc 2, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Beinn an Tuirc 2 Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/beinn-an-tuirc-2/ (Accessed: [date]).

Other ScottishPower wind farms

More wind farms in North Scotland

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.