Loading the live figure from Elexon…
Output over the last 7 days
Arecleoch since 2019: every month and year
Elexon's metered record for Arecleoch's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 1.5 TWh. Its busiest whole year was 2020, at a load factor of 21%. Its best day was 11 November 2019, when it generated 2,130 MWh, 89 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 142 GWh | 18% |
| 2025 | 194 GWh | 19% |
| 2024 | 183 GWh | 18% |
| 2023 | 156 GWh | 16% |
| 2022 | 190 GWh | 19% |
| 2021 | 173 GWh | 17% |
| 2020 | 208 GWh | 21% |
| 2019from 1 Feb | 209 GWh | 23% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_ARCHW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Arecleoch
Arecleoch is an onshore wind farm in Ayrshire, Scotland, with 114 MW of registered generating capacity across one balancing mechanism unit. It is the 53rd largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by ScottishPower. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Arecleoch as operational since June 2011, with 60 turbines of 2 MW.
| Type | Onshore wind farm |
|---|---|
| Registered capacity | 114 MW |
| Turbines | 60 turbines of 2 MW |
| Operational since | June 2011 |
| Location | Ayrshire, Scotland |
| Owner group | ScottishPower (operator or majority owner; joint ventures simplified) |
| Operator in REPD | ScottishPower Renewables |
| Elexon lead party | SP Renewables (UK) Limited |
| BM unit | T_ARCHW-1 114 MW |
| Size | 53rd largest of 163 |
Download and cite
Every finished UK day GridMonkey has recorded for Arecleoch, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Arecleoch Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/arecleoch/ (Accessed: [date]).
Other ScottishPower wind farms
- East Anglia One offshore, 725 MW
- East Anglia Three offshore, 680 MW
- Whitelee onshore, 309 MW
- Kilgallioch onshore, 228 MW
- Whitelee Extension onshore, 206 MW
- Harestanes onshore, 142 MW
- Cumberhead West onshore, 126 MW
- Black Law onshore, 118 MW
- Hagshaw Hill onshore, 81 MW
- Dersalloch onshore, 71 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.