Bad a' Cheò wind farm

Bad a' Cheò is an onshore wind farm in Highland, Scotland with 27 MW of registered capacity. In 2025 it generated 79.1 GWh, a load factor of 33%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since February 2019.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Bad a' Cheò since 2019: every month and year

Elexon's metered record for Bad a' Cheò's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 526 GWh. Its busiest whole year was 2024, at a load factor of 34%. Its best day was 3 January 2024, when it generated 634 MWh, 26 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 27 MW. Hover over or tap a bar for the month’s figures.
Bad a' Cheò's metered output by year
YearGeneratedLoad factor
2026to 24 Oct63.5 GWh33%
202579.1 GWh33%
202481.7 GWh34%
202361.1 GWh26%
202247.3 GWh20%
202157.9 GWh24%
202079 GWh33%
2019from 1 Feb56.4 GWh26%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_BDCHW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Bad a' Cheò

Bad a' Cheò is an onshore wind farm in Highland, Scotland, with 27 MW of registered generating capacity across one balancing mechanism unit. It is the 143rd largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by RWE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Bad a' Cheò as operational since May 2019, with 13 turbines of 2.05 MW, up to 112 m tall to the blade tip.

Bad a' Cheò
Where Bad a' Cheò is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity27 MW
Turbines13 turbines of 2.05 MW
Height to blade tip112 m
Operational sinceMay 2019
LocationHighland, Scotland
Owner groupRWE (operator or majority owner; joint ventures simplified)
Operator in REPDInnogy
Elexon lead partyRWE Generation UK plc
BM unit T_BDCHW-1 27 MW
Size143rd largest of 163

Download and cite

Bad a' Cheò daily output (CSV)

Every finished UK day GridMonkey has recorded for Bad a' Cheò, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Bad a' Cheò Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/bad-a-cheo/ (Accessed: [date]).

Other RWE wind farms

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.