About BritNed
BritNed runs about 260 km from Isle of Grain, Kent, to Maasvlakte, Rotterdam, the Netherlands. It has been in service since April 2011.
Like all of Britain's interconnectors it carries direct current, and power can flow either way. Which way it flows is set by the electricity markets at each end: power generally flows towards whichever side's price is higher. The live figure above is Elexon's, every five minutes: positive when power is coming into Great Britain, negative when it is going out. The chart uses Elexon's half-hourly figures, which GridMonkey records every half hour.
| Connects | Great Britain and the Netherlands |
|---|---|
| Capacity | 1,000 MW, either way |
| In Britain | Isle of Grain, Kent 51.440° N, 0.717° E |
| Other end | Maasvlakte, Rotterdam, the Netherlands |
| Owners | National Grid and TenneT |
| In service since | April 2011 |
| Length | About 260 km |
| Technology | HVDC, ±450 kV |
| Elexon fuel type | INTNED |
Britain's other interconnectors
- IFA France, 2,000 MW
- IFA2 France, 1,000 MW
- ElecLink France, 1,000 MW
- Nemo Link Belgium, 1,000 MW
- North Sea Link Norway, 1,400 MW
- Viking Link Denmark, 1,400 MW
- Moyle Northern Ireland, 500 MW
- East West Ireland, 500 MW
- Greenlink Ireland, 500 MW
All 10 interconnectors, live → Every big power station, live → Every wind farm, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Facts checked on 23 October 2026 against TenneT, CEER and BritNed. Position: © OpenStreetMap contributors.