North Sea Link interconnector

North Sea Link is a 1,400 MW undersea power cable between Northumberland and Norway, owned by National Grid and Statnett. Which way is it flowing right now? Its live flow from Elexon, the GB electricity market's data service, and every half hour of the last week.

Checking Elexon for North Sea Link's flow right now…

Flowing now
– MW

Loading the live figure from Elexon…

Flow over the last 7 days

Loading the last 7 days…

About North Sea Link

North Sea Link runs about 720 km from East Sleekburn, near Blyth, Northumberland, to Kvilldal, Rogaland, Norway. It has been in service since October 2021. It opened at up to 700 MW and was ramped up from there to its full 1,400 MW.

Like all of Britain's interconnectors it carries direct current, and power can flow either way. Which way it flows is set by the electricity markets at each end: power generally flows towards whichever side's price is higher. The live figure above is Elexon's, every five minutes: positive when power is coming into Great Britain, negative when it is going out. The chart uses Elexon's half-hourly figures, which GridMonkey records every half hour.

North Sea Link
Where North Sea Link reaches Britain: its converter station, from OpenStreetMap. Map outline: Natural Earth.
ConnectsGreat Britain and Norway
Capacity1,400 MW, either way
In BritainEast Sleekburn, near Blyth, Northumberland
55.147° N, 1.540° W
Other endKvilldal, Rogaland, Norway
OwnersNational Grid and Statnett
In service sinceOctober 2021
LengthAbout 720 km
TechnologyHVDC, ±515 kV
Elexon fuel typeINTNSL

Britain's other interconnectors

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Facts checked on 23 October 2026 against National Grid, North Sea Link and Hitachi Energy. Position: © OpenStreetMap contributors.

Britain's whole grid, live

GridMonkey shows where Britain's electricity is coming from right now, imports included, as one big pie. Free, no sign-up.