Greenlink interconnector

Greenlink is a 500 MW undersea power cable between Pembrokeshire and Ireland, owned by Equitix and Baltic Cable (Statkraft). Which way is it flowing right now? Its live flow from Elexon, the GB electricity market's data service, and every half hour of the last week.

Checking Elexon for Greenlink's flow right now…

Flowing now
– MW

Loading the live figure from Elexon…

Flow over the last 7 days

Loading the last 7 days…

About Greenlink

Greenlink runs about 190 km from Pembroke, Pembrokeshire, to Great Island, County Wexford, Ireland. It has been in service since January 2025.

Like all of Britain's interconnectors it carries direct current, and power can flow either way. Which way it flows is set by the electricity markets at each end: power generally flows towards whichever side's price is higher. The live figure above is Elexon's, every five minutes: positive when power is coming into Great Britain, negative when it is going out. The chart uses Elexon's half-hourly figures, which GridMonkey records every half hour.

Greenlink
Where Greenlink reaches Britain: its converter station's site, from Wikipedia. Map outline: Natural Earth.
ConnectsGreat Britain and Ireland
Capacity500 MW, either way
In BritainPembroke, Pembrokeshire
51.683° N, 4.988° W
Other endGreat Island, County Wexford, Ireland
OwnersEquitix and Baltic Cable (Statkraft)
In service sinceJanuary 2025
LengthAbout 190 km
TechnologyHVDC, ±320 kV
Elexon fuel typeINTGRNL

Britain's other interconnectors

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Facts checked on 23 October 2026 against Greenlink and EirGrid. Position: Wikipedia.