Torness since 2019: every month and year
Elexon's metered record for Torness' units starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 66.8 TWh. Its busiest whole year was 2020, at a load factor of 87%. Its best day was 17 March 2023, when it generated 31,393 MWh, 1,308 MW on average.
| Year | Generated | Load factor | Days it ran |
|---|---|---|---|
| 2026to 24 Oct | 6.3 TWh | 65% | 297 |
| 2025 | 9.0 TWh | 76% | 364 |
| 2024 | 8.4 TWh | 70% | 363 |
| 2023 | 8.7 TWh | 73% | 365 |
| 2022 | 7.5 TWh | 64% | 365 |
| 2021 | 7.0 TWh | 59% | 365 |
| 2020 | 10.3 TWh | 87% | 365 |
| 2019from 1 Feb | 9.6 TWh | 89% | 334 |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 2 units (T_TORN-1, T_TORN-2), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it ran if it generated at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Torness
Torness is a nuclear power station near Dunbar in East Lothian. It was commissioned in 1988. It has two advanced gas-cooled reactors (AGRs), each driving its own turbine generator.
Its 1,352 MW of registered generating capacity is spread across 2 balancing mechanism units. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.
Nuclear stations run flat out for months at a time, so their output changes little from hour to hour, until a reactor stops for refuelling or repairs.
| Type | Nuclear |
|---|---|
| Registered capacity | 1,352 MW |
| Commissioned | 1988 (DUKES 5.11) |
| Area | East Lothian |
| Location | Near Dunbar in East Lothian 55.968° N, 2.410° W |
| Owner or operator | EDF |
| Elexon lead party | EDF Energy Nuclear Generation |
| BM units | T_TORN-1 652 MW, T_TORN-2 700 MW |
| Size | The largest of the 5 nuclear power stations on GridMonkey's list |
Download and cite
Every finished UK day GridMonkey has recorded for Torness, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Torness Nuclear Power Station: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/torness/ (Accessed: [date]).
Other nuclear power stations
- Heysham 2 1,336 MW, Lancashire
- Sizewell B 1,287 MW, Suffolk
- Hartlepool 1,240 MW, County Durham
- Heysham 1 1,195 MW, Lancashire
All 158 power stations, live → Power station league table → Power station outages now → Every wind farm, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names, areas and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Year commissioned and location: Power stations in the United Kingdom (DUKES 5.11) (Department for Energy Security and Net Zero, May 2026). Contains public sector information licensed under the Open Government Licence v3.0.