Checking Elexon for ElecLink's flow right now…
Loading the live figure from Elexon…
Flow over the last 7 days
About ElecLink
ElecLink runs about 51 km from the Channel Tunnel terminal at Folkestone, Kent, to Peuplingues, near Calais, France. It has been in service since May 2022. It runs through the Channel Tunnel itself rather than under the sea bed.
Like all of Britain's interconnectors it carries direct current, and power can flow either way. Which way it flows is set by the electricity markets at each end: power generally flows towards whichever side's price is higher. The live figure above is Elexon's, every five minutes: positive when power is coming into Great Britain, negative when it is going out. The chart uses Elexon's half-hourly figures, which GridMonkey records every half hour.
| Connects | Great Britain and France |
|---|---|
| Capacity | 1,000 MW, either way |
| In Britain | The Channel Tunnel terminal at Folkestone, Kent 51.098° N, 1.145° E |
| Other end | Peuplingues, near Calais, France |
| Owners | Getlink |
| In service since | May 2022 |
| Length | About 51 km |
| Technology | HVDC, ±320 kV |
| Elexon fuel type | INTELEC |
Britain's other interconnectors
- IFA France, 2,000 MW
- IFA2 France, 1,000 MW
- BritNed the Netherlands, 1,000 MW
- Nemo Link Belgium, 1,000 MW
- North Sea Link Norway, 1,400 MW
- Viking Link Denmark, 1,400 MW
- Moyle Northern Ireland, 500 MW
- East West Ireland, 500 MW
- Greenlink Ireland, 500 MW
All 10 interconnectors, live → Every big power station, live → Every wind farm, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Facts checked on 23 October 2026 against Siemens, Getlink (Business Wire) and Getlink. Position: Wikipedia.