Westermost Rough wind farm

What Westermost Rough is generating right now, and over the last week: live from Elexon, the GB electricity market's data service.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

About Westermost Rough

Westermost Rough is an offshore wind farm off the coast of England, with 205 MW of registered generating capacity across one balancing mechanism unit. It is the 41st largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Ørsted. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Westermost Rough as operational since May 2015, with 35 turbines of 6 MW.

Westermost Rough
Where Westermost Rough is, from its REPD location. Map outline: Natural Earth.
TypeOffshore wind farm
Registered capacity205 MW
Turbines35 turbines of 6 MW
Operational sinceMay 2015
LocationOff the coast of England
Owner groupØrsted (operator or majority owner; joint ventures simplified)
Operator in REPDØrsted
Elexon lead partyWestermost Rough Limited
BM unit T_WTMSO-1 205 MW
Size41st largest of 163

Other Ørsted wind farms

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's output here is its physical notification, not metered generation. Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.