Westermost Rough wind farm

Westermost Rough is an offshore wind farm off the coast of England with 205 MW of registered capacity. In 2025 it generated 855 GWh, a load factor of 48%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since February 2019.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Westermost Rough since 2019: every month and year

Elexon's metered record for Westermost Rough's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 6.6 TWh. Its busiest whole year was 2020, at a load factor of 53%. Its best day was 17 November 2020, when it generated 4,941 MWh, 206 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 205 MW. Hover over or tap a bar for the month’s figures.
Westermost Rough's metered output by year
YearGeneratedLoad factor
2026to 24 Oct705 GWh48%
2025855 GWh48%
2024852 GWh47%
2023804 GWh45%
2022845 GWh47%
2021790 GWh44%
2020952 GWh53%
2019from 1 Feb791 GWh48%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_WTMSO-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Westermost Rough

Westermost Rough is an offshore wind farm off the coast of England, with 205 MW of registered generating capacity across one balancing mechanism unit. It is the 42nd largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Ørsted. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Westermost Rough as operational since May 2015, with 35 turbines of 6 MW.

Westermost Rough
Where Westermost Rough is, from its REPD location. Map outline: Natural Earth.
TypeOffshore wind farm
Registered capacity205 MW
Turbines35 turbines of 6 MW
Operational sinceMay 2015
LocationOff the coast of England
Owner groupØrsted (operator or majority owner; joint ventures simplified)
Operator in REPDØrsted
Elexon lead partyWestermost Rough Limited
BM unit T_WTMSO-1 205 MW
Size42nd largest of 163

Download and cite

Westermost Rough daily output (CSV)

Every finished UK day GridMonkey has recorded for Westermost Rough, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Westermost Rough Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/westermost-rough/ (Accessed: [date]).

Other Ørsted wind farms

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.