Race Bank wind farm

Race Bank is an offshore wind farm off the coast of England with 574 MW of registered capacity. In 2025 it generated 2.1 TWh, a load factor of 42%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since February 2019.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Race Bank since 2019: every month and year

Elexon's metered record for Race Bank's units starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 16.6 TWh. Its busiest whole year was 2020, at a load factor of 47%. Its best day was 13 February 2021, when it generated 13,530 MWh, 564 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 574 MW. Hover over or tap a bar for the month’s figures.
Race Bank's metered output by year
YearGeneratedLoad factor
2026to 24 Oct1.7 TWh41%
20252.1 TWh42%
20242.0 TWh41%
20232.2 TWh44%
20222.2 TWh43%
20212.1 TWh41%
20202.4 TWh47%
2019from 1 Feb1.9 TWh42%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 2 units (T_RCBKO-1, T_RCBKO-2), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Race Bank

Race Bank is an offshore wind farm off the coast of England, with 574 MW of registered generating capacity across 2 balancing mechanism units. It is the 17th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Ørsted. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Race Bank as operational since June 2017, with 91 turbines of 6.3 MW, up to 154 m tall to the blade tip.

Race Bank
Where Race Bank is, from its REPD location. Map outline: Natural Earth.
TypeOffshore wind farm
Registered capacity574 MW
Turbines91 turbines of 6.3 MW
Height to blade tip154 m
Operational sinceJune 2017
LocationOff the coast of England
Owner groupØrsted (operator or majority owner; joint ventures simplified)
Operator in REPDØrsted
Elexon lead partyRace Bank Wind Farm Ltd
BM units T_RCBKO-1 284 MW, T_RCBKO-2 290 MW
Size17th largest of 163

Download and cite

Race Bank daily output (CSV)

Every finished UK day GridMonkey has recorded for Race Bank, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Race Bank Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/race-bank/ (Accessed: [date]).

Other Ørsted wind farms

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.