Output over the last 7 days
About Walney
Walney is an offshore wind farm off the coast of England, with 366 MW of registered generating capacity across 2 balancing mechanism units. It is the 25th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Ørsted. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Walney as operational since May 2011, with 102 turbines of 3.6 MW.
| Type | Offshore wind farm |
|---|---|
| Registered capacity | 366 MW |
| Turbines | 102 turbines of 3.6 MW |
| Operational since | May 2011 |
| Location | Off the coast of England |
| Owner group | Ørsted (operator or majority owner; joint ventures simplified) |
| Operator in REPD | Ørsted |
| Elexon lead party | Walney Offshore Windfarms Ltd |
| BM units | T_WLNYO-2 184 MW, T_WLNYW-1 182 MW |
| Size | 25th largest of 163 |
Other Ørsted wind farms
- Hornsea 2 offshore, 1,320 MW
- Hornsea 1 offshore, 1,200 MW
- Walney Extension offshore, 675 MW
- Race Bank offshore, 574 MW
- West of Duddon Sands offshore, 398 MW
- Hornsea 3 offshore, 330 MW
- Lincs offshore, 270 MW
- Burbo Bank Extension offshore, 258 MW
- Westermost Rough offshore, 205 MW
- Gunfleet Sands offshore, 172 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's output here is its physical notification, not metered generation. Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.