Crystal Rig IV wind farm

Crystal Rig IV is an onshore wind farm in Borders, Scotland with 48 MW of registered capacity. In 2026 so far (to 24 Oct) it generated 121 GWh, a load factor of 35%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since October 2025.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Crystal Rig IV since 2025: every month and year

Elexon's metered record for Crystal Rig IV's unit starts on 23 October 2025, and runs to 24 October 2026. In that time it has generated 122 GWh. Its best day was 12 March 2026, when it generated 1,083 MWh, 45 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 48 MW. Hover over or tap a bar for the month’s figures.
Crystal Rig IV's metered output by year
YearGeneratedLoad factor
2026to 24 Oct121 GWh35%
2025from 23 Oct694 MWh0.9%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_CRYRW-4, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Crystal Rig IV

Crystal Rig IV is an onshore wind farm in Borders, Scotland, with 48 MW of registered generating capacity across one balancing mechanism unit. It is the 105th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Fred. Olsen Renewables. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Crystal Rig IV as under construction in the July 2026 edition (it may already be generating some of its output), with 11 turbines of 4 MW, up to 200 m tall to the blade tip.

Crystal Rig IV
Where Crystal Rig IV is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity48 MW
Turbines11 turbines of 4 MW
Height to blade tip200 m
StatusUnder construction (REPD, July 2026)
LocationBorders, Scotland
Owner groupFred. Olsen Renewables (operator or majority owner; joint ventures simplified)
Operator in REPDFred Olsen Renewables
Elexon lead partyErova Energy Limited
BM unit T_CRYRW-4 48 MW
Size105th largest of 163

Download and cite

Crystal Rig IV daily output (CSV)

Every finished UK day GridMonkey has recorded for Crystal Rig IV, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Crystal Rig IV Wind Farm: Live Output and History Since 2025. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/crystal-rig-iv/ (Accessed: [date]).

Other Fred. Olsen Renewables wind farms

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since October 2025 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.