Loading the live figure from Elexon…
Output over the last 7 days
Crystal Rig II since 2019: every month and year
Elexon's metered record for Crystal Rig II's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 2.5 TWh. Its busiest whole year was 2020, at a load factor of 29%. Its best day was 29 January 2023, when it generated 3,187 MWh, 133 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 273 GWh | 25% |
| 2025 | 285 GWh | 22% |
| 2024 | 316 GWh | 24% |
| 2023 | 287 GWh | 22% |
| 2022 | 348 GWh | 26% |
| 2021 | 307 GWh | 23% |
| 2020 | 380 GWh | 29% |
| 2019from 1 Feb | 300 GWh | 25% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_CRYRW-2, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Crystal Rig II
Crystal Rig II is an onshore wind farm in Borders, Scotland, with 151 MW of registered generating capacity across one balancing mechanism unit. It is the 46th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Fred. Olsen Renewables. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Crystal Rig II as operational since October 2010, with 60 turbines of 2.3 MW.
| Type | Onshore wind farm |
|---|---|
| Registered capacity | 151 MW |
| Turbines | 60 turbines of 2.3 MW |
| Operational since | October 2010 |
| Location | Borders, Scotland |
| Owner group | Fred. Olsen Renewables (operator or majority owner; joint ventures simplified) |
| Operator in REPD | Fred Olsen Renewables |
| Elexon lead party | Eneco Energy Trade |
| BM unit | T_CRYRW-2 151 MW |
| Size | 46th largest of 163 |
Download and cite
Crystal Rig II daily output (CSV)
Every finished UK day GridMonkey has recorded for Crystal Rig II, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Crystal Rig II Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/crystal-rig-ii/ (Accessed: [date]).
Other Fred. Olsen Renewables wind farms
- Mid Hill onshore, 76 MW
- Paul's Hill onshore, 70 MW
- Brockloch Rig 2 onshore, 62 MW
- Rothes onshore, 55 MW
- Crystal Rig IV onshore, 48 MW
- Rothes II onshore, 42 MW
- Crystal Rig III onshore, 14 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.