Brockloch Rig 2 wind farm

Brockloch Rig 2 is an onshore wind farm in Dumfries and Galloway, Scotland with 62 MW of registered capacity. In 2025 it generated 167 GWh, a load factor of 31%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since February 2019.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Brockloch Rig 2 since 2019: every month and year

Elexon's metered record for Brockloch Rig 2's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 1.3 TWh. Its busiest whole year was 2020, at a load factor of 36%. Its best day was 17 March 2026, when it generated 1,435 MWh, 60 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 62 MW. Hover over or tap a bar for the month’s figures.
Brockloch Rig 2's metered output by year
YearGeneratedLoad factor
2026to 24 Oct133 GWh30%
2025167 GWh31%
2024159 GWh29%
2023155 GWh29%
2022193 GWh36%
2021155 GWh29%
2020194 GWh36%
2019from 1 Feb176 GWh35%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_WISTW-2, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Brockloch Rig 2

Brockloch Rig 2 is an onshore wind farm in Dumfries and Galloway, Scotland, with 62 MW of registered generating capacity across one balancing mechanism unit. It is the 85th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Fred. Olsen Renewables. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

Brockloch Rig 2 has sent no power since 30 September 2026: Elexon's metered figures show nothing exported and its maximum export limit is 0 MW, although its trader still sends notifications of what it would generate, which is the live figure above. Neither Elexon's outage notices nor Fred. Olsen Renewables give a reason. The league table lists it without a rank while it sends no power.

The government's Renewable Energy Planning Database lists Brockloch Rig 2 as operational since June 2017, with turbines up to 120 m tall to the blade tip. Fred. Olsen Renewables gives it 30 turbines of 2.05 MW.

Brockloch Rig 2
Where Brockloch Rig 2 is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity62 MW
Turbines30 turbines of 2.05 MW (Fred. Olsen Renewables)
Height to blade tip120 m
Status nowSending no power since 30 September 2026 (Elexon)
Operational sinceJune 2017
LocationDumfries and Galloway, Scotland
Owner groupFred. Olsen Renewables (operator or majority owner; joint ventures simplified)
Operator in REPDFred Olsen Renewables
Elexon lead partyBROCKLOCH RIG WINDFARM LTD
BM unit T_WISTW-2 62 MW
Size85th largest of 163

Download and cite

Brockloch Rig 2 daily output (CSV)

Every finished UK day GridMonkey has recorded for Brockloch Rig 2, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Brockloch Rig 2 Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/brockloch-rig-2/ (Accessed: [date]).

Other Fred. Olsen Renewables wind farms

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.