Output over the last 7 days
Hill of Glaschyle since 2019: every month and year
Elexon's metered record for Hill of Glaschyle's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 359 GWh. Its busiest whole year was 2022, at a load factor of 21%. Its best day was 13 February 2021, when it generated 620 MWh, 26 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 39.9 GWh | 20% |
| 2025 | 45.4 GWh | 19% |
| 2024 | 47 GWh | 19% |
| 2023 | 41.6 GWh | 17% |
| 2022 | 51.3 GWh | 21% |
| 2021 | 41.5 GWh | 17% |
| 2020 | 50.3 GWh | 21% |
| 2019from 1 Feb | 41.9 GWh | 19% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, E_HLGLW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Hill of Glaschyle
Hill of Glaschyle is an onshore wind farm in Grampian, Scotland, with 28 MW of registered generating capacity across one balancing mechanism unit. It is the 140th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Muirden Energy. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Hill of Glaschyle as operational since December 2016, with 12 turbines of 2.3 MW, up to 99 m tall to the blade tip.
| Type | Onshore wind farm |
|---|---|
| Registered capacity | 28 MW |
| Turbines | 12 turbines of 2.3 MW |
| Height to blade tip | 99 m |
| Operational since | December 2016 |
| Location | Grampian, Scotland |
| Grid region | North Scotland |
| Owner group | Muirden Energy (operator or majority owner; joint ventures simplified) |
| Operator in REPD | Muirden Energy |
| Elexon lead party | ENGIE Power Limited |
| BM unit | E_HLGLW-1 28 MW |
| Size | 140th largest of 163 |
Download and cite
Hill of Glaschyle daily output (CSV)
Every finished UK day GridMonkey has recorded for Hill of Glaschyle, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Hill of Glaschyle Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/hill-of-glaschyle/ (Accessed: [date]).
More wind farms in North Scotland
- Mid Hill onshore, 76 MW
- Braes of Doune onshore, 74 MW
- Paul's Hill onshore, 70 MW
- Berry Burn onshore, 63 MW
- Moy onshore, 60 MW
- Rothes onshore, 55 MW
- Baillie onshore, 53 MW
- Beinn an Tuirc III onshore, 52 MW
- Camster onshore, 50 MW
- Kincardine offshore, 50 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.