Coire na Cloiche wind farm

Coire na Cloiche is an onshore wind farm in Highland, Scotland with 31 MW of registered capacity. In 2025 it generated 66.2 GWh, a load factor of 24%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since February 2019.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Coire na Cloiche since 2019: every month and year

Elexon's metered record for Coire na Cloiche's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 534 GWh. Its busiest whole year was 2020, at a load factor of 29%. Its best day was 13 January 2020, when it generated 704 MWh, 29 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 31 MW. Hover over or tap a bar for the month’s figures.
Coire na Cloiche's metered output by year
YearGeneratedLoad factor
2026to 24 Oct51.9 GWh24%
202566.2 GWh24%
202474 GWh27%
202362.8 GWh23%
202278.2 GWh29%
202162.3 GWh23%
202078.3 GWh29%
2019from 1 Feb60.4 GWh24%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, E_CNCLW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Coire na Cloiche

Coire na Cloiche is an onshore wind farm in Highland, Scotland, with 31 MW of registered generating capacity across one balancing mechanism unit. It is the 132nd largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Coire na Cloiche as operational since March 2020, with 13 turbines of 2.3 MW.

Coire na Cloiche
Where Coire na Cloiche is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity31 MW
Turbines13 turbines of 2.3 MW
Operational sinceMarch 2020
LocationHighland, Scotland
Grid regionNorth Scotland
Operator in REPDRockbySea
Elexon lead partyStatkraft Markets Gmbh
BM unit E_CNCLW-1 31 MW
Size132nd largest of 163

Download and cite

Coire na Cloiche daily output (CSV)

Every finished UK day GridMonkey has recorded for Coire na Cloiche, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Coire na Cloiche Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/coire-na-cloiche/ (Accessed: [date]).

More wind farms in North Scotland

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.