Blary Hill wind farm

Blary Hill is an onshore wind farm in Strathclyde, Scotland with 35 MW of registered capacity. In 2025 it generated 88.5 GWh, a load factor of 29%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since October 2021.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Blary Hill since 2021: every month and year

Elexon's metered record for Blary Hill's unit starts on 27 October 2021, and runs to 24 October 2026. In that time it has generated 451 GWh. Its busiest whole year was 2022, at a load factor of 32%. Its best day was 20 December 2023, when it generated 839 MWh, 35 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 35 MW. Hover over or tap a bar for the month’s figures.
Blary Hill's metered output by year
YearGeneratedLoad factor
2026to 24 Oct72.6 GWh29%
202588.5 GWh29%
202489.2 GWh29%
202391.8 GWh30%
202298 GWh32%
2021from 27 Oct10.6 GWh14%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, E_BLARW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Blary Hill

Blary Hill is an onshore wind farm in Strathclyde, Scotland, with 35 MW of registered generating capacity across one balancing mechanism unit. It is the 130th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by TRIG. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Blary Hill as operational since January 2022, with 14 turbines of 2.5 MW, up to 110 m tall to the blade tip.

Blary Hill
Where Blary Hill is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity35 MW
Turbines14 turbines of 2.5 MW
Height to blade tip110 m
Operational sinceJanuary 2022
LocationStrathclyde, Scotland
Grid regionNorth Scotland
Owner groupTRIG (The Renewables Infrastructure Group) (operator or majority owner; joint ventures simplified)
Operator in REPDThe Renewables Infrastructure Group
Elexon lead partyErova Energy Limited
BM unit E_BLARW-1 35 MW
Size130th largest of 163

Download and cite

Blary Hill daily output (CSV)

Every finished UK day GridMonkey has recorded for Blary Hill, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Blary Hill Wind Farm: Live Output and History Since 2021. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/blary-hill/ (Accessed: [date]).

Other TRIG wind farms

More wind farms in North Scotland

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since October 2021 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.