Foyers is a 320 MW pumped storage hydro station on the shore of Loch Ness in the Highlands, operated or mostly owned by SSE. In 2025 it supplied 300 GWh and took 353 GWh while pumping. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since February 2019.
Checking Elexon for Foyers's output this half hour…
Generating now
– MW
Loading the live figure from Elexon…
Output over the last 7 days
Supplying the grid (above the line)Pumping: taking power (below the line)
Elexon's metered record for Foyers' units starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has supplied 2.1 TWh and taken 2.4 TWh while pumping, giving back 87% of what it took. Its busiest whole year was 2024, at a load factor of 13%. Its best day was 22 November 2024, when it supplied 4,412 MWh, 184 MW on average.
100 MW50 MW100 MW taken
20192020202120222023202420252026
Its average output each month, in MW; below the line, what it took from the grid while pumping. Its capacity today is 320 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Foyers' metered output by year
Year
Supplied
Took while pumping
Load factor
Days supplying
2026to 24 Oct
222 GWh
268 GWh
10%
213
2025
300 GWh
353 GWh
11%
279
2024
353 GWh
391 GWh
13%
305
2023
349 GWh
398 GWh
12%
316
2022
291 GWh
338 GWh
10%
320
2021
233 GWh
248 GWh
8%
336
2020
166 GWh
196 GWh
6%
239
2019from 1 Feb
180 GWh
216 GWh
7%
253
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation
unit, as settled) for its 2 units (T_FOYE-1, T_FOYE-2), fetched on 2026-11-16. Load factor is against its capacity today, over
the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour.
The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Foyers
Foyers is a pumped storage hydro station on the shore of Loch Ness in the Highlands. It was commissioned in 1974. It pumps water uphill to its top reservoir when power is plentiful, and lets it back down through turbines when the grid needs it.
Its 320 MW of registered generating capacity is spread across 2 balancing mechanism units.
Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live
figure above, and GridMonkey records it every half hour for the chart.
Pumped storage stations are giant water batteries: they pump water uphill when power is plentiful and generate when the grid needs it, within a minute or two.
Where Foyers is. From its grid reference in DUKES 5.11. Map outline: Natural Earth.
Type
Pumped storage hydro
Registered capacity
320 MW
Commissioned
1974 (DUKES 5.11)
Area
Highland
Location
On the shore of Loch Ness in the Highlands 57.262° N, 4.483° W
Owner or operator
SSE
Elexon lead party
SSE Generation Ltd
BM units
T_FOYE-1 160 MW, T_FOYE-2 160 MW
Size
4th largest of the 4 pumped storage stations on GridMonkey's list
Every finished UK day GridMonkey has recorded for Foyers, up to the last 12 months: the energy it generated, its
average output, load factor and peak, and the hours it ran, and what it took from the grid while it pumped.
The output is what its units told the grid they would generate (their physical notifications), not metered
generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column
means.
Cite this page (Harvard)
Energycount (2026) Foyers Pumped Storage Power Station: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/foyers/ (Accessed: [date]).