Cruachan pumped storage power station

Cruachan is a 453 MW pumped storage hydro station on Loch Awe in Argyll and Bute, operated or mostly owned by Drax. In 2025 it supplied 367 GWh and took 424 GWh while pumping. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since February 2019.

Checking Elexon for Cruachan's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Cruachan since 2019: every month and year

Elexon's metered record for Cruachan's units starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has supplied 2.6 TWh and taken 2.9 TWh while pumping, giving back 87% of what it took. Its busiest whole year was 2024, at a load factor of 12%. Its best day was 5 July 2024, when it supplied 5,228 MWh, 218 MW on average.

Its average output each month, in MW; below the line, what it took from the grid while pumping. Its capacity today is 453 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Cruachan's metered output by year
YearSuppliedTook while pumpingLoad factorDays supplying
2026to 24 Oct259 GWh287 GWh8%259
2025367 GWh424 GWh9%336
2024473 GWh572 GWh12%353
2023421 GWh507 GWh11%350
2022319 GWh370 GWh8%342
2021234 GWh291 GWh6%338
2020266 GWh272 GWh7%340
2019from 1 Feb217 GWh218 GWh6%304

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 4 units (T_CRUA-1, T_CRUA-2, T_CRUA-3, T_CRUA-4), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Cruachan

Cruachan is a pumped storage hydro station on Loch Awe in Argyll and Bute. It was commissioned in 1965. It pumps water uphill to its top reservoir when power is plentiful, and lets it back down through turbines when the grid needs it.

Its 453 MW of registered generating capacity is spread across 4 balancing mechanism units. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.

Pumped storage stations are giant water batteries: they pump water uphill when power is plentiful and generate when the grid needs it, within a minute or two.

Cruachan
Where Cruachan is. DUKES 5.11's grid reference is about 10 km out, so the map uses OpenStreetMap's position for the station. Map outline: Natural Earth.
TypePumped storage hydro
Registered capacity453 MW
Commissioned1965 (DUKES 5.11)
AreaArgyll and Bute
LocationOn Loch Awe in Argyll and Bute
56.394° N, 5.114° W
Owner or operatorDrax
Elexon lead partyDrax Pumped Storage Limited
BM units T_CRUA-1 123 MW, T_CRUA-2 125 MW, T_CRUA-3 101 MW, T_CRUA-4 104 MW
Size2nd largest of the 4 pumped storage stations on GridMonkey's list

Download and cite

Cruachan daily output (CSV)

Every finished UK day GridMonkey has recorded for Cruachan, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran, and what it took from the grid while it pumped. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Cruachan Pumped Storage Power Station: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/cruachan/ (Accessed: [date]).

Other pumped storage stations

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names, areas and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Year commissioned: Power stations in the United Kingdom (DUKES 5.11) (Department for Energy Security and Net Zero, May 2026). Contains public sector information licensed under the Open Government Licence v3.0. Map position: © OpenStreetMap contributors.

Every power station in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and which stations are running right now. Free, no sign-up.