Ffestiniog is a 365 MW pumped storage hydro station near Blaenau Ffestiniog in Gwynedd, owned by Engie. In 2025 it supplied 66.1 GWh and took 88.3 GWh while pumping. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since February 2019.
Checking Elexon for Ffestiniog's output this half hour…
Generating now
– MW
Loading the live figure from Elexon…
Output over the last 7 days
Supplying the grid (above the line)Pumping: taking power (below the line)
Elexon's metered record for Ffestiniog's units starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has supplied 930 GWh and taken 1.3 TWh while pumping, giving back 70% of what it took. Its busiest whole year was 2023, at a load factor of 6%. Its best day was 11 March 2026, when it supplied 1,539 MWh, 64 MW on average.
50 MW25 MW50 MW taken
20192020202120222023202420252026
Its average output each month, in MW; below the line, what it took from the grid while pumping. Its capacity today is 365 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Ffestiniog's metered output by year
Year
Supplied
Took while pumping
Load factor
Days supplying
2026to 24 Oct
126 GWh
170 GWh
5%
249
2025
66.1 GWh
88.3 GWh
2%
231
2024
128 GWh
172 GWh
4%
295
2023
181 GWh
255 GWh
6%
355
2022
156 GWh
214 GWh
5%
344
2021
109 GWh
163 GWh
3%
362
2020
110 GWh
167 GWh
3%
344
2019from 1 Feb
54.1 GWh
95.5 GWh
2%
333
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation
unit, as settled) for its 4 units (T_FFES-1, T_FFES-2, T_FFES-3, T_FFES-4), fetched on 2026-11-16. Load factor is against its capacity today, over
the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour.
The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Ffestiniog
Ffestiniog is a pumped storage hydro station near Blaenau Ffestiniog in Gwynedd. It was commissioned in 1963. It pumps water uphill to its top reservoir when power is plentiful, and lets it back down through turbines when the grid needs it.
Its 365 MW of registered generating capacity is spread across 4 balancing mechanism units.
Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live
figure above, and GridMonkey records it every half hour for the chart.
Pumped storage stations are giant water batteries: they pump water uphill when power is plentiful and generate when the grid needs it, within a minute or two.
Where Ffestiniog is. From its grid reference in DUKES 5.11. Map outline: Natural Earth.
Type
Pumped storage hydro
Registered capacity
365 MW
Commissioned
1963 (DUKES 5.11)
Area
Gwynedd
Location
Near Blaenau Ffestiniog in Gwynedd 52.981° N, 3.969° W
Every finished UK day GridMonkey has recorded for Ffestiniog, up to the last 12 months: the energy it generated, its
average output, load factor and peak, and the hours it ran, and what it took from the grid while it pumped.
The output is what its units told the grid they would generate (their physical notifications), not metered
generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column
means.
Cite this page (Harvard)
Energycount (2026) Ffestiniog Pumped Storage Power Station: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/ffestiniog/ (Accessed: [date]).