Dinorwig is a 1,920 MW pumped storage hydro station near Llanberis in Gwynedd, owned by Engie. In 2025 it supplied 717 GWh and took 991 GWh while pumping. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since February 2019.
Checking Elexon for Dinorwig's output this half hour…
Generating now
– MW
Loading the live figure from Elexon…
Output over the last 7 days
Supplying the grid (above the line)Pumping: taking power (below the line)
Elexon's metered record for Dinorwig's units starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has supplied 8.1 TWh and taken 11.3 TWh while pumping, giving back 72% of what it took. Its busiest whole year was 2021, at a load factor of 8%. Its best day was 31 December 2023, when it supplied 9,252 MWh, 386 MW on average.
250 MW125 MW500 MW taken
20192020202120222023202420252026
Its average output each month, in MW; below the line, what it took from the grid while pumping. Its capacity today is 1,920 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Dinorwig's metered output by year
Year
Supplied
Took while pumping
Load factor
Days supplying
2026to 24 Oct
816 GWh
1.1 TWh
6%
297
2025
717 GWh
991 GWh
4%
229
2024
1.1 TWh
1.5 TWh
7%
365
2023
841 GWh
1.2 TWh
5%
247
2022
1.3 TWh
1.7 TWh
7%
364
2021
1.3 TWh
1.8 TWh
8%
364
2020
989 GWh
1.4 TWh
6%
364
2019from 1 Feb
1.1 TWh
1.5 TWh
7%
334
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation
unit, as settled) for its 6 units (T_DINO-1, T_DINO-2, T_DINO-3, T_DINO-4, T_DINO-5, T_DINO-6), fetched on 2026-11-16. Load factor is against its capacity today, over
the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour.
The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Dinorwig
Dinorwig is a pumped storage hydro station near Llanberis in Gwynedd. It was commissioned in 1984. It pumps water uphill to its top reservoir when power is plentiful, and lets it back down through turbines when the grid needs it.
Its 1,920 MW of registered generating capacity is spread across 6 balancing mechanism units.
Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live
figure above, and GridMonkey records it every half hour for the chart.
Pumped storage stations are giant water batteries: they pump water uphill when power is plentiful and generate when the grid needs it, within a minute or two.
Where Dinorwig is. From its grid reference in DUKES 5.11. Map outline: Natural Earth.
Every finished UK day GridMonkey has recorded for Dinorwig, up to the last 12 months: the energy it generated, its
average output, load factor and peak, and the hours it ran, and what it took from the grid while it pumped.
The output is what its units told the grid they would generate (their physical notifications), not metered
generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column
means.
Cite this page (Harvard)
Energycount (2026) Dinorwig Pumped Storage Power Station: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/dinorwig/ (Accessed: [date]).