Checking Elexon for Tees Renewable Energy Plant's output this half hour…
Loading the live figure from Elexon…
Output over the last 7 days
Tees Renewable Energy Plant since 2019: every month and year
Elexon's metered record for Tees Renewable Energy Plant's unit starts on 14 May 2019, and runs to 24 October 2026. In that time it has generated 3.8 TWh. Its busiest whole year was 2025, at a load factor of 53%. Its best day was 22 February 2024, when it generated 6,560 MWh, 273 MW on average.
| Year | Generated | Load factor | Days it ran |
|---|---|---|---|
| 2026to 24 Oct | 1.2 TWh | 59% | 217 |
| 2025 | 1.3 TWh | 53% | 249 |
| 2024 | 1.1 TWh | 46% | 215 |
| 2023 | 131 GWh | 5% | 39 |
| 2022 | 39 GWh | 2% | 25 |
| 2021 | 0 MWh | 0% | 0 |
| 2020 | 0 MWh | 0% | 0 |
| 2019from 14 May | 0 MWh | 0% | 0 |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_TSREP-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it ran if it generated at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Tees Renewable Energy Plant
Tees Renewable Energy Plant is a biomass power station at Teesport on Teesside.
Its 285 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.
Biomass stations burn wood pellets or other plant material instead of fossil fuel. The two biggest, Drax and Lynemouth, were coal-fired until they were converted.
| Type | Biomass |
|---|---|
| Registered capacity | 285 MW |
| Area | Teesside |
| Location | At Teesport on Teesside 54.602° N, 1.161° W |
| Owner or operator | MGT Teesside |
| Elexon lead party | MGT TEESSIDE LTD. |
| BM unit | T_TSREP-1 285 MW |
| Size | 3rd largest of the 6 biomass power stations on GridMonkey's list |
Download and cite
Tees Renewable Energy Plant daily output (CSV)
Every finished UK day GridMonkey has recorded for Tees Renewable Energy Plant, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Tees Renewable Energy Plant: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/tees-renewable-energy-plant/ (Accessed: [date]).
Other biomass power stations
- Drax 2,737 MW, North Yorkshire
- Lynemouth 420 MW, Northumberland
- Wilton 182 MW, Teesside
- Markinch 61 MW, Fife
- Tilbury Green 43 MW, Essex
All 158 power stations, live → Power station league table → Power station outages now → Every wind farm, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names, areas and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since May 2019 is its metered output (B1610). Location: Renewable Energy Planning Database (REPD) (Department for Energy Security and Net Zero, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.