Checking Elexon for Markinch's output this half hour…
Loading the live figure from Elexon…
Output over the last 7 days
Markinch since 2019: every month and year
Elexon's metered record for Markinch's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 2.4 TWh. Its busiest whole year was 2023, at a load factor of 69%. Its best day was 2 June 2021, when it generated 1,302 MWh, 54 MW on average.
| Year | Generated | Load factor | Days it ran |
|---|---|---|---|
| 2026to 24 Oct | 160 GWh | 37% | 143 |
| 2025 | 204 GWh | 38% | 180 |
| 2024 | 324 GWh | 60% | 280 |
| 2023 | 366 GWh | 69% | 310 |
| 2022 | 362 GWh | 68% | 309 |
| 2021 | 316 GWh | 59% | 270 |
| 2020 | 347 GWh | 65% | 293 |
| 2019from 1 Feb | 355 GWh | 73% | 288 |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, E_MARK-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it ran if it generated at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Markinch
Markinch is a biomass power station at Markinch, near Glenrothes, in Fife. It was commissioned in 2014. It is a combined heat and power plant: it also supplies heat to the Glenrothes Energy Network.
Elexon registers its one balancing mechanism unit at 86 MW, but DUKES 5.11, the government's list of power stations, gives it 61 MW, and that is the capacity this page uses. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey has recorded it every half hour since it was added to the list in October 2026, for the chart.
Biomass stations burn wood pellets or other plant material instead of fossil fuel. The two biggest, Drax and Lynemouth, were coal-fired until they were converted.
| Type | Biomass |
|---|---|
| Capacity | 61 MW (DUKES 5.11) |
| Registered capacity | 86 MW (Elexon) |
| Commissioned | 2014 (DUKES 5.11) |
| Area | Fife |
| Location | At Markinch, near Glenrothes, in Fife 56.201° N, 3.162° W |
| Owner or operator | RWE |
| Elexon lead party | Edgware Energy Limited |
| BM unit | E_MARK-1 86 MW |
| Size | 5th largest of the 6 biomass power stations on GridMonkey's list |
Download and cite
Every finished UK day GridMonkey has recorded for Markinch, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Markinch Power Station: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/markinch/ (Accessed: [date]).
Other biomass power stations
- Drax 2,737 MW, North Yorkshire
- Lynemouth 420 MW, Northumberland
- Tees Renewable Energy Plant 285 MW, Teesside
- Wilton 182 MW, Teesside
- Tilbury Green 43 MW, Essex
All 158 power stations, live → Power station league table → Power station outages now → Every wind farm, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names, areas and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Capacity, year commissioned and location: Power stations in the United Kingdom (DUKES 5.11) (Department for Energy Security and Net Zero, May 2026). Contains public sector information licensed under the Open Government Licence v3.0.