Output over the last 7 days
South Humber Bank since 2019: every month and year
Elexon's metered record for South Humber Bank's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 11.2 TWh. Its busiest whole year was 2020, at a load factor of 57%. Its best day was 21 January 2020, when it generated 13,342 MWh, 556 MW on average.
| Year | Generated | Load factor | Days it ran |
|---|---|---|---|
| 2026to 24 Oct | 611 GWh | 15% | 156 |
| 2025 | 1.0 TWh | 20% | 247 |
| 2024 | 785 GWh | 15% | 180 |
| 2023 | 1.2 TWh | 23% | 186 |
| 2022 | 672 GWh | 13% | 151 |
| 2021 | 1.8 TWh | 36% | 206 |
| 2020 | 2.9 TWh | 57% | 328 |
| 2019from 1 Feb | 2.2 TWh | 48% | 283 |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_SHBA-2, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it ran if it generated at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About South Humber Bank
South Humber Bank is a combined-cycle gas turbine (CCGT) station near Grimsby in Lincolnshire. It was commissioned in 1997. Only its second phase runs: the first has been out of service since September 2026, and its notice to the market keeps it out until 2043.
Its 580 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.
Gas stations follow demand: they ramp up when the wind drops or the evening peak arrives, and back off when there is plenty of wind and sun. Most are combined-cycle (CCGT); a few open-cycle turbines (OCGT) start fast to cover peaks.
| Type | Combined-cycle gas turbine (CCGT) station |
|---|---|
| Registered capacity | 580 MW |
| Commissioned | 1997 (DUKES 5.11) |
| Area | Lincolnshire |
| Location | Near Grimsby in Lincolnshire 53.603° N, 0.146° W |
| Owner or operator | EP UK |
| Elexon lead party | EP UK INVESTMENTS LIMITED |
| BM unit | T_SHBA-2 580 MW |
| Size | 26th largest of the 45 gas power stations on GridMonkey's list |
Download and cite
South Humber Bank daily output (CSV)
Every finished UK day GridMonkey has recorded for South Humber Bank, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) South Humber Bank Power Station: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/south-humber-bank/ (Accessed: [date]).
Other gas power stations
- Pembroke 2,375 MW, Pembrokeshire
- Staythorpe 1,856 MW, Nottinghamshire
- Didcot B 1,490 MW, Oxfordshire
- Connah's Quay 1,412 MW, Flintshire
- West Burton B 1,410 MW, Nottinghamshire
- Grain 1,326 MW, Kent
- Immingham CHP 1,283 MW, Lincolnshire
- Seabank 1,236 MW, Bristol
- Saltend 1,226 MW, East Riding of Yorkshire
- Peterhead 1,200 MW, Aberdeenshire
- Spalding 950 MW, Lincolnshire
- Carrington 940 MW, Greater Manchester
All 158 power stations, live → Power station league table → Power station outages now → Every wind farm, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names, areas and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Year commissioned and location: Power stations in the United Kingdom (DUKES 5.11) (Department for Energy Security and Net Zero, May 2026). Contains public sector information licensed under the Open Government Licence v3.0.