Carrington power station

Carrington is a 940 MW gas-fired power station in Greater Manchester, owned by ESB. In 2025 it generated 3.1 TWh and ran on 327 days, a load factor of 38%. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since February 2019.

Checking Elexon for Carrington's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Carrington since 2019: every month and year

Elexon's metered record for Carrington's units starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 27.2 TWh. Its busiest whole year was 2022, at a load factor of 59%. Its best day was 3 March 2021, when it generated 21,426 MWh, 893 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 940 MW. Hover over or tap a bar for the month’s figures.
Carrington's metered output by year
YearGeneratedLoad factorDays it ran
2026to 24 Oct2.4 TWh36%266
20253.1 TWh38%327
20243.1 TWh37%310
20233.2 TWh39%314
20224.9 TWh59%345
20214.7 TWh57%355
20202.3 TWh29%299
2019from 1 Feb3.6 TWh47%326

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 2 units (T_CARR-1, T_CARR-2), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it ran if it generated at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Carrington

Carrington is a combined-cycle gas turbine (CCGT) station in Greater Manchester. It was commissioned in 2016.

Its 940 MW of registered generating capacity is spread across 2 balancing mechanism units. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.

Gas stations follow demand: they ramp up when the wind drops or the evening peak arrives, and back off when there is plenty of wind and sun. Most are combined-cycle (CCGT); a few open-cycle turbines (OCGT) start fast to cover peaks.

Carrington
Where Carrington is. From its grid reference in DUKES 5.11. Map outline: Natural Earth.
TypeCombined-cycle gas turbine (CCGT) station
Registered capacity940 MW
Commissioned2016 (DUKES 5.11)
AreaGreater Manchester
Location53.433° N, 2.404° W
OwnerESB (DUKES 5.11)
Elexon lead partyCarrington Power Ltd
BM units T_CARR-1 470 MW, T_CARR-2 470 MW
Size12th largest of the 45 gas power stations on GridMonkey's list

Download and cite

Carrington daily output (CSV)

Every finished UK day GridMonkey has recorded for Carrington, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Carrington Power Station: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/carrington/ (Accessed: [date]).

Other gas power stations

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names and areas come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Owner, year commissioned and location: Power stations in the United Kingdom (DUKES 5.11) (Department for Energy Security and Net Zero, May 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every power station in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and which stations are running right now. Free, no sign-up.