Checking Elexon for Medway's output this half hour…
Loading the live figure from Elexon…
Output over the last 7 days
Medway since 2019: every month and year
Elexon's metered record for Medway's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 8.1 TWh. Its busiest whole year was 2020, at a load factor of 30%. Its best day was 12 December 2024, when it generated 17,010 MWh, 709 MW on average. In Elexon's metered record, which ends on 24 October 2026, it last ran on 19 January 2026.
| Year | Generated | Load factor | Days it ran |
|---|---|---|---|
| 2026to 24 Oct | 58.9 GWh | 1% | 9 |
| 2025 | 392 GWh | 6% | 65 |
| 2024 | 560 GWh | 8% | 64 |
| 2023 | 1.3 TWh | 19% | 134 |
| 2022 | 1.6 TWh | 25% | 190 |
| 2021 | 736 GWh | 11% | 134 |
| 2020 | 2.0 TWh | 30% | 281 |
| 2019from 1 Feb | 1.4 TWh | 23% | 225 |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_MEDP-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it ran if it generated at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Medway
Medway is a combined-cycle gas turbine (CCGT) station on the Isle of Grain in Kent. It was commissioned in 1995.
Its 750 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.
Gas stations follow demand: they ramp up when the wind drops or the evening peak arrives, and back off when there is plenty of wind and sun. Most are combined-cycle (CCGT); a few open-cycle turbines (OCGT) start fast to cover peaks.
| Type | Combined-cycle gas turbine (CCGT) station |
|---|---|
| Registered capacity | 750 MW |
| Commissioned | 1995 (DUKES 5.11) |
| Area | Kent |
| Location | On the Isle of Grain in Kent 51.440° N, 0.690° E |
| Owner or operator | SSE |
| Elexon lead party | Medway Power Ltd |
| BM unit | T_MEDP-1 750 MW |
| Size | 23rd largest of the 45 gas power stations on GridMonkey's list |
Download and cite
Every finished UK day GridMonkey has recorded for Medway, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Medway Power Station: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/medway/ (Accessed: [date]).
Other gas power stations
- Pembroke 2,375 MW, Pembrokeshire
- Staythorpe 1,856 MW, Nottinghamshire
- Didcot B 1,490 MW, Oxfordshire
- Connah's Quay 1,412 MW, Flintshire
- West Burton B 1,410 MW, Nottinghamshire
- Grain 1,326 MW, Kent
- Immingham CHP 1,283 MW, Lincolnshire
- Seabank 1,236 MW, Bristol
- Saltend 1,226 MW, East Riding of Yorkshire
- Peterhead 1,200 MW, Aberdeenshire
- Spalding 950 MW, Lincolnshire
- Carrington 940 MW, Greater Manchester
All 158 power stations, live → Power station league table → Power station outages now → Every wind farm, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names, areas and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Year commissioned and location: Power stations in the United Kingdom (DUKES 5.11) (Department for Energy Security and Net Zero, May 2026). Contains public sector information licensed under the Open Government Licence v3.0.