Elexon's metered record for Keadby 2's unit starts on 24 November 2020, and runs to 24 October 2026. In that time it has generated 14.4 TWh. Its busiest whole year was 2024, at a load factor of 52%. Its best day was 27 February 2023, when it generated 20,633 MWh, 860 MW on average.
| Year | Generated | Load factor | Days it ran |
|---|---|---|---|
| 2026to 24 Oct | 3.0 TWh | 47% | 206 |
| 2025 | 3.9 TWh | 49% | 267 |
| 2024 | 4.0 TWh | 52% | 270 |
| 2023 | 2.4 TWh | 31% | 166 |
| 2022 | 1.1 TWh | 14% | 118 |
| 2021 | 6.6 GWh | 0.1% | 9 |
| 2020from 24 Nov | 0 MWh | 0% | 0 |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_KEAD-2, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it ran if it generated at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Keadby 2
Keadby 2 is a combined-cycle gas turbine (CCGT) station near Scunthorpe in Lincolnshire. It was commissioned in 2023.
Its 890 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.
Gas stations follow demand: they ramp up when the wind drops or the evening peak arrives, and back off when there is plenty of wind and sun. Most are combined-cycle (CCGT); a few open-cycle turbines (OCGT) start fast to cover peaks.
| Type | Combined-cycle gas turbine (CCGT) station |
|---|---|
| Registered capacity | 890 MW |
| Commissioned | 2023 (DUKES 5.11) |
| Area | Lincolnshire |
| Location | Near Scunthorpe in Lincolnshire 53.595° N, 0.752° W |
| Owner or operator | SSE |
| Elexon lead party | Keadby Generation Limited |
| BM unit | T_KEAD-2 890 MW |
| Size | 15th largest of the 45 gas power stations on GridMonkey's list |
Download and cite
Every finished UK day GridMonkey has recorded for Keadby 2, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Keadby 2 Power Station: Live Output and History Since 2020. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/keadby-2/ (Accessed: [date]).
Other gas power stations
- Pembroke 2,375 MW, Pembrokeshire
- Staythorpe 1,856 MW, Nottinghamshire
- Didcot B 1,490 MW, Oxfordshire
- Connah's Quay 1,412 MW, Flintshire
- West Burton B 1,410 MW, Nottinghamshire
- Grain 1,326 MW, Kent
- Immingham CHP 1,283 MW, Lincolnshire
- Seabank 1,236 MW, Bristol
- Saltend 1,226 MW, East Riding of Yorkshire
- Peterhead 1,200 MW, Aberdeenshire
- Spalding 950 MW, Lincolnshire
- Carrington 940 MW, Greater Manchester
All 158 power stations, live → Power station league table → Power station outages now → Every wind farm, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names, areas and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since November 2020 is its metered output (B1610). Year commissioned and location: Power stations in the United Kingdom (DUKES 5.11) (Department for Energy Security and Net Zero, May 2026). Contains public sector information licensed under the Open Government Licence v3.0.