Checking Elexon for Fellside's output this half hour…
Loading the live figure from Elexon…
Output over the last 7 days
Fellside since 2019: every month and year
Elexon's metered record for Fellside's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 158 GWh. Its busiest whole year was 2020, at a load factor of 2%. Its best day was 3 February 2019, when it generated 1,796 MWh, 75 MW on average.
| Year | Generated | Load factor | Days it ran |
|---|---|---|---|
| 2026to 24 Oct | 11.6 GWh | 1% | 134 |
| 2025 | 10.2 GWh | 0.8% | 128 |
| 2024 | 15.3 GWh | 1% | 166 |
| 2023 | 10.2 GWh | 0.8% | 130 |
| 2022 | 12.1 GWh | 1% | 167 |
| 2021 | 1.4 GWh | 0.1% | 25 |
| 2020 | 29.2 GWh | 2% | 186 |
| 2019from 1 Feb | 67.6 GWh | 6% | 139 |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, E_FELL-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it ran if it generated at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Fellside
Fellside is a gas-fired combined heat and power (CHP) plant at Sellafield in Cumbria. It was commissioned in 1993. It was built to supply steam and power to the Sellafield nuclear site; two of its three units were retired in 2019 and 2020 and have since been demolished.
Its 140 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.
Fellside's last unit supplies the Sellafield site, and Elexon's metered figures for Fellside are below zero in every half hour from 13 to 20 October 2026: on balance it takes power from the grid rather than sending it. The league table lists it without a rank while it sends no power.
Gas stations follow demand: they ramp up when the wind drops or the evening peak arrives, and back off when there is plenty of wind and sun. Most are combined-cycle (CCGT); a few open-cycle turbines (OCGT) start fast to cover peaks.
| Type | Gas-fired combined heat and power (CHP) plant |
|---|---|
| Registered capacity | 140 MW |
| Commissioned | 1993 (DUKES 5.11) |
| Status now | Sending no power (Elexon; GOV.UK) |
| Area | Cumbria |
| Location | At Sellafield in Cumbria 54.420° N, 3.493° W |
| Owner or operator | Sellafield Ltd |
| Elexon lead party | NDA |
| BM unit | E_FELL-1 140 MW |
| Size | 37th largest of the 45 gas power stations on GridMonkey's list |
Download and cite
Every finished UK day GridMonkey has recorded for Fellside, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Fellside Power Station: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/fellside/ (Accessed: [date]).
Other gas power stations
- Pembroke 2,375 MW, Pembrokeshire
- Staythorpe 1,856 MW, Nottinghamshire
- Didcot B 1,490 MW, Oxfordshire
- Connah's Quay 1,412 MW, Flintshire
- West Burton B 1,410 MW, Nottinghamshire
- Grain 1,326 MW, Kent
- Immingham CHP 1,283 MW, Lincolnshire
- Seabank 1,236 MW, Bristol
- Saltend 1,226 MW, East Riding of Yorkshire
- Peterhead 1,200 MW, Aberdeenshire
- Spalding 950 MW, Lincolnshire
- Carrington 940 MW, Greater Manchester
All 158 power stations, live → Power station league table → Power station outages now → Every wind farm, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names, areas and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Year commissioned and location: Power stations in the United Kingdom (DUKES 5.11) (Department for Energy Security and Net Zero, May 2026). Contains public sector information licensed under the Open Government Licence v3.0.