Fellside power station

Fellside is a 140 MW gas-fired combined heat and power (CHP) plant at Sellafield in Cumbria, operated or mostly owned by Sellafield Ltd. In 2025 it generated 10.2 GWh and ran on 128 days, a load factor of 0.8%. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since February 2019.

Checking Elexon for Fellside's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Fellside since 2019: every month and year

Elexon's metered record for Fellside's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 158 GWh. Its busiest whole year was 2020, at a load factor of 2%. Its best day was 3 February 2019, when it generated 1,796 MWh, 75 MW on average.

Its average output each month, in MW. Its capacity today is 140 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Fellside's metered output by year
YearGeneratedLoad factorDays it ran
2026to 24 Oct11.6 GWh1%134
202510.2 GWh0.8%128
202415.3 GWh1%166
202310.2 GWh0.8%130
202212.1 GWh1%167
20211.4 GWh0.1%25
202029.2 GWh2%186
2019from 1 Feb67.6 GWh6%139

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, E_FELL-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it ran if it generated at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Fellside

Fellside is a gas-fired combined heat and power (CHP) plant at Sellafield in Cumbria. It was commissioned in 1993. It was built to supply steam and power to the Sellafield nuclear site; two of its three units were retired in 2019 and 2020 and have since been demolished.

Its 140 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.

Fellside's last unit supplies the Sellafield site, and Elexon's metered figures for Fellside are below zero in every half hour from 13 to 20 October 2026: on balance it takes power from the grid rather than sending it. The league table lists it without a rank while it sends no power.

Gas stations follow demand: they ramp up when the wind drops or the evening peak arrives, and back off when there is plenty of wind and sun. Most are combined-cycle (CCGT); a few open-cycle turbines (OCGT) start fast to cover peaks.

Fellside
Where Fellside is. From its grid reference in DUKES 5.11. Map outline: Natural Earth.
TypeGas-fired combined heat and power (CHP) plant
Registered capacity140 MW
Commissioned1993 (DUKES 5.11)
Status nowSending no power (Elexon; GOV.UK)
AreaCumbria
LocationAt Sellafield in Cumbria
54.420° N, 3.493° W
Owner or operatorSellafield Ltd
Elexon lead partyNDA
BM unit E_FELL-1 140 MW
Size37th largest of the 45 gas power stations on GridMonkey's list

Download and cite

Fellside daily output (CSV)

Every finished UK day GridMonkey has recorded for Fellside, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Fellside Power Station: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/fellside/ (Accessed: [date]).

Other gas power stations

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names, areas and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Year commissioned and location: Power stations in the United Kingdom (DUKES 5.11) (Department for Energy Security and Net Zero, May 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every power station in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and which stations are running right now. Free, no sign-up.