Output over the last 7 days
Thanet since 2019: every month and year
Elexon's metered record for Thanet's units starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 6.8 TWh. Its busiest whole year was 2020, at a load factor of 39%. Its best day was 6 February 2022, when it generated 7,092 MWh, 296 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 620 GWh | 29% |
| 2025 | 830 GWh | 32% |
| 2024 | 896 GWh | 34% |
| 2023 | 947 GWh | 36% |
| 2022 | 823 GWh | 31% |
| 2021 | 859 GWh | 33% |
| 2020 | 1.0 TWh | 39% |
| 2019from 1 Feb | 794 GWh | 33% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 2 units (T_THNTO-1, T_THNTO-2), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Thanet
Thanet is an offshore wind farm off the coast of England, with 300 MW of generating capacity across 2 balancing mechanism units: Elexon registers them at 518 MW in all, but Vattenfall gives it 300 MW, and that is the capacity this page uses. It is the 31st largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Vattenfall. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Thanet as operational since September 2010, with 100 turbines of 3 MW.
| Type | Offshore wind farm |
|---|---|
| Capacity | 300 MW (Vattenfall) |
| Registered capacity | 518 MW (Elexon) |
| Turbines | 100 turbines of 3 MW |
| Operational since | September 2010 |
| Location | Off the coast of England |
| Owner group | Vattenfall (operator or majority owner; joint ventures simplified) |
| Operator in REPD | Vattenfall |
| Elexon lead party | Thanet Offshore Wind Limited |
| BM units | T_THNTO-1 288 MW, T_THNTO-2 230 MW |
| Size | 31st largest of 163 |
Download and cite
Every finished UK day GridMonkey has recorded for Thanet, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Thanet Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/thanet/ (Accessed: [date]).
Other Vattenfall wind farms
- Pen y Cymoedd onshore, 228 MW
- Ormonde offshore, 151 MW
- Aberdeen Bay offshore, 99 MW
- Edinbane onshore, 41 MW
- Clashindarroch onshore, 39 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.