Elexon's metered record for Pen y Cymoedd's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 4.8 TWh. Its busiest whole year was 2020, at a load factor of 35%. Its best day was 12 February 2021, when it generated 5,178 MWh, 216 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 506 GWh | 31% |
| 2025 | 620 GWh | 31% |
| 2024 | 597 GWh | 30% |
| 2023 | 612 GWh | 31% |
| 2022 | 611 GWh | 31% |
| 2021 | 573 GWh | 29% |
| 2020 | 697 GWh | 35% |
| 2019from 1 Feb | 570 GWh | 31% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_PNYCW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Pen y Cymoedd
Pen y Cymoedd is an onshore wind farm in Neath Port Talbot, Wales, with 228 MW of registered generating capacity across one balancing mechanism unit. It is the 36th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Vattenfall. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Pen y Cymoedd as operational since May 2017, with 76 turbines of 3 MW.
| Type | Onshore wind farm |
|---|---|
| Registered capacity | 228 MW |
| Turbines | 76 turbines of 3 MW |
| Operational since | May 2017 |
| Location | Neath Port Talbot, Wales |
| Owner group | Vattenfall (operator or majority owner; joint ventures simplified) |
| Operator in REPD | Vattenfall |
| Elexon lead party | Pen y Cymoedd Wind Farm LTD |
| BM unit | T_PNYCW-1 228 MW |
| Size | 36th largest of 163 |
Download and cite
Pen y Cymoedd daily output (CSV)
Every finished UK day GridMonkey has recorded for Pen y Cymoedd, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Pen y Cymoedd Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/pen-y-cymoedd/ (Accessed: [date]).
Other Vattenfall wind farms
- Thanet offshore, 300 MW
- Ormonde offshore, 151 MW
- Aberdeen Bay offshore, 99 MW
- Edinbane onshore, 41 MW
- Clashindarroch onshore, 39 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.