Kilgallioch Extension wind farm

Kilgallioch Extension is an onshore wind farm in Dumfries and Galloway, Scotland with 50 MW of capacity. In 2026 so far (to 24 Oct) it generated 73 GWh, a load factor of 20%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since October 2025.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Kilgallioch Extension since 2025: every month and year

Elexon's metered record for Kilgallioch Extension's unit starts on 23 October 2025, and runs to 24 October 2026. In that time it has generated 74.1 GWh. Its best day was 19 September 2026, when it generated 795 MWh, 33 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 50 MW. Hover over or tap a bar for the month’s figures.
Kilgallioch Extension's metered output by year
YearGeneratedLoad factor
2026to 24 Oct73 GWh20%
2025from 23 Oct1.1 GWh1%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_KLGLW-2, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Kilgallioch Extension

Kilgallioch Extension is an onshore wind farm in Dumfries and Galloway, Scotland, with 50 MW of generating capacity across one balancing mechanism unit: Elexon registers it at 225 MW, but REPD gives it 50 MW, and that is the capacity this page uses. It is the 100th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by ScottishPower. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since it was added to the list in October 2026 for the chart.

Kilgallioch Extension, nine turbines next to Kilgallioch, is still being built: its first turbine went up in September 2025 and its first power reached the grid in December 2025, and ScottishPower Renewables has announced no completion. The league table lists it without a rank until it is running in full.

The government's Renewable Energy Planning Database lists Kilgallioch Extension as under construction in the July 2026 edition, with 9 turbines of 5.6 MW, up to 180 m tall to the blade tip.

Kilgallioch Extension
Where Kilgallioch Extension is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Capacity50 MW (REPD)
Registered capacity225 MW (Elexon)
Turbines9 turbines of 5.6 MW
Height to blade tip180 m
Status nowNot yet running in full (ScottishPower Renewables; Elexon)
StatusUnder construction (REPD, July 2026)
LocationDumfries and Galloway, Scotland
Owner groupScottishPower (operator or majority owner; joint ventures simplified)
Operator in REPDScottishPower Renewables
Elexon lead partySP Renewables (UK) Limited
BM unit T_KLGLW-2 225 MW
Size100th largest of 163

Download and cite

Kilgallioch Extension daily output (CSV)

Every finished UK day GridMonkey has recorded for Kilgallioch Extension, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Kilgallioch Extension Wind Farm: Live Output and History Since 2025. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/kilgallioch-extension/ (Accessed: [date]).

Other ScottishPower wind farms

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since October 2025 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.