Loading the live figure from Elexon…
Output over the last 7 days
Halsary since 2020: every month and year
Elexon's metered record for Halsary's unit starts on 2 December 2020, and runs to 24 October 2026. In that time it has generated 318 GWh. Its busiest whole year was 2022, at a load factor of 30%. Its best day was 3 January 2024, when it generated 665 MWh, 28 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 29.1 GWh | 14% |
| 2025 | 31.9 GWh | 12% |
| 2024 | 46.3 GWh | 18% |
| 2023 | 55.1 GWh | 21% |
| 2022 | 78.4 GWh | 30% |
| 2021 | 77.1 GWh | 29% |
| 2020from 2 Dec | 581 MWh | 3% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_HALSW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Halsary
Halsary is an onshore wind farm in Highland, Scotland, with 30 MW of registered generating capacity across one balancing mechanism unit. It is the 136th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by ScottishPower. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Halsary as operational since March 2021, with 15 turbines of 2.3 MW, up to 120 m tall to the blade tip.
| Type | Onshore wind farm |
|---|---|
| Registered capacity | 30 MW |
| Turbines | 15 turbines of 2.3 MW |
| Height to blade tip | 120 m |
| Operational since | March 2021 |
| Location | Highland, Scotland |
| Owner group | ScottishPower (operator or majority owner; joint ventures simplified) |
| Operator in REPD | ScottishPower Renewables |
| Elexon lead party | SP Renewables (UK) Limited |
| BM unit | T_HALSW-1 30 MW |
| Size | 136th largest of 163 |
Download and cite
Every finished UK day GridMonkey has recorded for Halsary, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Halsary Wind Farm: Live Output and History Since 2020. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/halsary/ (Accessed: [date]).
Other ScottishPower wind farms
- East Anglia One offshore, 725 MW
- East Anglia Three offshore, 680 MW
- Whitelee onshore, 309 MW
- Kilgallioch onshore, 228 MW
- Whitelee Extension onshore, 206 MW
- Harestanes onshore, 142 MW
- Cumberhead West onshore, 126 MW
- Black Law onshore, 118 MW
- Arecleoch onshore, 114 MW
- Hagshaw Hill onshore, 81 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since December 2020 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.