Aikengall II wind farm

Aikengall II is an onshore wind farm in Lothian, Scotland with 64 MW of registered capacity. In 2025 it generated 180 GWh, a load factor of 32%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since February 2019.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Aikengall II since 2019: every month and year

Elexon's metered record for Aikengall II's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 1.6 TWh. Its busiest whole year was 2020, at a load factor of 39%. Its best day was 15 November 2025, when it generated 1,834 MWh, 76 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 64 MW. Hover over or tap a bar for the month’s figures.
Aikengall II's metered output by year
YearGeneratedLoad factor
2026to 24 Oct147 GWh32%
2025180 GWh32%
2024209 GWh37%
2023177 GWh32%
2022210 GWh38%
2021187 GWh33%
2020217 GWh39%
2019from 1 Feb225 GWh44%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_AKGLW-2, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Aikengall II

Aikengall II is an onshore wind farm in Lothian, Scotland, with 64 MW of registered generating capacity across one balancing mechanism unit. It is the 83rd largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Community Windpower. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Aikengall II as operational since November 2017, with 19 turbines of 3.2 MW, up to 145 m tall to the blade tip.

Aikengall II
Where Aikengall II is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity64 MW
Turbines19 turbines of 3.2 MW
Height to blade tip145 m
Operational sinceNovember 2017
LocationLothian, Scotland
Owner groupCommunity Windpower (operator or majority owner; joint ventures simplified)
Operator in REPDCommunity Windpower
Elexon lead partyAikengall 2 CWCL
BM unit T_AKGLW-2 64 MW
Size83rd largest of 163

Download and cite

Aikengall II daily output (CSV)

Every finished UK day GridMonkey has recorded for Aikengall II, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Aikengall II Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/aikengall-ii/ (Accessed: [date]).

Other Community Windpower wind farms

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.