Checking Elexon for Taylor's Lane's output this half hour…
Loading the live figure from Elexon…
Output over the last 7 days
Taylor's Lane since 2019: every month and year
Elexon's metered record for Taylor's Lane's units starts on 24 May 2019, and runs to 24 October 2026. In that time it has generated 19.3 GWh. Its busiest whole year was 2021, at a load factor of 0.6%. Its best day was 3 November 2021, when it generated 1,305 MWh, 54 MW on average.
| Year | Generated | Load factor | Days it ran |
|---|---|---|---|
| 2026to 24 Oct | 769 MWh | 0.1% | 6 |
| 2025 | 1.6 GWh | 0.1% | 10 |
| 2024 | 619 MWh | 0% | 10 |
| 2023 | 1.5 GWh | 0.1% | 10 |
| 2022 | 3.9 GWh | 0.3% | 20 |
| 2021 | 7.9 GWh | 0.6% | 23 |
| 2020 | 2.2 GWh | 0.2% | 17 |
| 2019from 24 May | 824 MWh | 0.1% | 7 |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 2 units (E_TAYL2G, E_TAYL3G), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it ran if it generated at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Taylor's Lane
Taylor's Lane is an oil-fired peaking plant at Willesden in north-west London. It was commissioned in 1979. Its open-cycle gas turbines burn gas oil and start quickly to cover peaks in demand.
Its 144 MW of registered generating capacity is spread across 2 balancing mechanism units. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.
Oil-fired peaking plants are gas turbines that burn gas oil, a fuel much like diesel. They start in minutes but cost a lot to run, so they run only in short bursts at peaks or when the grid is short of power, and most of the time show zero.
| Type | Oil-fired gas turbines (OCGT) |
|---|---|
| Registered capacity | 144 MW |
| Commissioned | 1979 (DUKES 5.11) |
| Area | London |
| Location | At Willesden in north-west London 51.546° N, 0.257° W |
| Owner or operator | Uniper |
| Elexon lead party | Uniper UK Limited |
| BM units | E_TAYL2G 72 MW, E_TAYL3G 72 MW |
| Size | The largest of the 4 oil-fired peaking plants on GridMonkey's list |
Download and cite
Taylor's Lane daily output (CSV)
Every finished UK day GridMonkey has recorded for Taylor's Lane, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Taylor's Lane Power Station: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/taylors-lane/ (Accessed: [date]).
Other oil-fired peaking plants
- Cowes 140 MW, Isle of Wight
- Indian Queens 140 MW, Cornwall
- Didcot OCGT 100 MW, Oxfordshire
All 158 power stations, live → Power station league table → Power station outages now → Every wind farm, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names, areas and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since May 2019 is its metered output (B1610). Year commissioned and location: Power stations in the United Kingdom (DUKES 5.11) (Department for Energy Security and Net Zero, May 2026). Contains public sector information licensed under the Open Government Licence v3.0.