The SAP EPC (New Build EPC)

The Energy Performance Certificate for a new dwelling is produced from the as-built SAP calculations — and without it, Building Control can't sign the dwelling off.

What it is

The SAP EPC — sometimes called the new-build EPC — is the final output of the as-built SAP calculation process. It’s lodged on the national register and is required before Building Control can issue a completion certificate, which makes it a critical-path item at the end of every project.

What we need to lodge your EPC

To finalise the as-built calculations and lodge the EPC, we need:

Get this list to us early and the EPC won’t hold up your sign-off. Get a quote or call 01202 623236.