New Build Compliance Pack

Every energy and sustainability report a new build needs, from one supplier, on one timeline — so the air test target in the SAP is the one we actually test to, the water calculation matches the fittings, and nothing falls down the gap between three consultants at sign-off.

Everything Building Regulations asks for, in one place

SAP calculations are usually just the start. A new dwelling also needs a water efficiency calculation, an air test of every plot, sound tests where it is attached to a neighbour, an EPC on completion, and — depending on the site — an overheating report and a planning energy statement. Rather than juggling a supplier for each, the Compliance Pack covers the lot:

Every development is different — packs are tailored to what your project actually needs, which may also include Part O overheating reports or an energy statement for planning. You pay for what applies.

One timeline

WhenWhat
Before work startsDesign-stage SAP and BREL; Part O report and energy statement where required
Once fittings are chosenPart G water calculation
Through the buildPart L photographs at each of the six stages
Envelope complete and sealedAir test — result into the as-built SAP
Rooms complete either side of a party wallSound tests
CompletionAs-built SAP, completion BREL and EPC, within five days

The new build compliance timeline takes the same sequence from feasibility and planning through to the completion certificate, stage by stage.

Why bundle?

Consistent assumptions. The SAP assumes an air permeability; the test we do is to that target, not a different company’s. The water calculation and the SAP both need the fittings and the hot water system, once. Sound and air testing both need to sit inside the completion programme, and one diary is easier to manage than two.

One point of contact. No chasing three companies at sign-off, and nobody saying the missing certificate is somebody else’s. You worry about the build; we keep the paperwork moving.

Get a quote or call 01202 623236 with your drawings and we will tell you exactly what your project needs.

Common questions

What is in the Compliance Pack?

The reports and tests every new dwelling needs for Building Control: design-stage and as-built SAP with the BREL reports, the EPC on completion, the Part G water efficiency calculation, air tightness testing of every plot, and Part E sound testing where dwellings are attached. Part O overheating reports and a planning energy statement are added where the site needs them. Packs are tailored to the project — you pay for what applies.

Why bundle them rather than buy separately?

Consistency and timing. The SAP assumes an air permeability; if a different company tests to a different target the as-built SAP fails. The water calculation depends on the fittings the SAP also needs. Sound and air tests both have to sit inside the completion programme. One supplier means one set of assumptions and one person chasing the dates.

What order do the reports happen in?

Design-stage SAP and, where needed, the Part O report and energy statement before work starts. The water calculation once fittings are chosen. Photographs through the build. Air test when the envelope is complete and sealed; sound test once rooms either side of the party wall are finished. Then the as-built SAP, the completion BREL and the EPC within five days of completion.

Do you cover the whole country?

The desktop work — SAP, EPC, water calculations, Part O, energy statements — is done from your drawings for sites anywhere in England and Wales. Air and sound testing need a tester on site — Dorset, Hampshire, Wiltshire and Somerset as the core, neighbouring counties regularly, further by arrangement. The where-we-travel page has the detail.

Want the whole lot handled as one job?

Send the drawings once and we'll price SAP, EPC, water, air and sound together — one point of contact, one set of deadlines, nothing falling down the gap between consultants.