What is DER/TER?

Seen DER or TER in Building Regulations paperwork or a planning condition? They're the carbon emission rates that decide whether your new dwelling passes Part L.

— reviewed against the regs as they stand.

Quick answer: DER is the Dwelling Emission Rate — your design’s calculated CO₂ emissions in kgCO₂/m² per year. TER is the Target Emission Rate, calculated for a notional dwelling of the same size and shape. Pass = DER ≤ TER. Both come out of the SAP calculation, and under Part L 2021 they sit alongside a primary-energy test (DPER ≤ TPER) and a fabric test (DFEE ≤ TFEE).

The carbon pass/fail

The Dwelling Emission Rate (DER) and Target Emission Rate (TER) are the primary CO₂ figures measured by SAP calculations, expressed in kgCO₂/m² per year. The design-stage SAP sets the target (TER); the proposed dwelling’s actual rate (DER) must be equal to or lower than it to pass Part L.

The TER is derived from a notional dwelling of the same type and size as yours. Under SAP 10 the notional dwelling has a demanding specification — including an assumed PV array — which is why the TER is much harder to beat than under older versions of SAP. A parallel primary energy target (DPER vs TPER) was also added in Part L 2021.

What moves the DER

Plenty: orientation, fuel choice, u-values, air tightness, thermal bridging, heating system efficiency and renewables. Energy assessors use the DER/TER gap to show the design team exactly where a dwelling is underperforming — and the cheapest places to claw it back.

The fabric side is the part you can test yourself before an assessor runs the full SAP: model element U-values in the free U-value calculator and junction Ψ-values in the free thermal-bridging calculator to see how much headroom your specification gives the DER — often the junctions are the cheapest place to find it.

Note that CO₂ isn’t the only criterion: fabric energy efficiency, limiting u-values, services and air tightness standards must all be met too. But miss the DER target and the dwelling fails regardless.

Want to know if your design passes?

Send the drawings and we'll run design-stage SAP and tell you where the DER lands against the TER — while the specification is still easy to change.