Sanquhar wind farm

Sanquhar is an onshore wind farm in Dumfries and Galloway, Scotland with 301 MW of registered capacity. In 2025 it generated 108 GWh, a load factor of 4%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since February 2019.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Sanquhar since 2019: every month and year

Elexon's metered record for Sanquhar's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 861 GWh. Its busiest whole year was 2022, at a load factor of 4%. Its best day was 28 December 2019, when it generated 769 MWh, 32 MW on average.

Its average output each month, in MW. Its capacity today is 301 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Sanquhar's metered output by year
YearGeneratedLoad factor
2026to 24 Oct102 GWh5%
2025108 GWh4%
2024113 GWh4%
202399.8 GWh4%
2022114 GWh4%
202198.5 GWh4%
2020113 GWh4%
2019from 1 Feb112 GWh5%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_SANQW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Sanquhar

Sanquhar is an onshore wind farm in Dumfries and Galloway, Scotland, with 301 MW of registered generating capacity across 3 balancing mechanism units. It is the 30th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Sanquhar as operational since February 2018, with 9 turbines of 3.4 MW.

Sanquhar
Where Sanquhar is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity301 MW
Turbines9 turbines of 3.4 MW
Operational sinceFebruary 2018
LocationDumfries and Galloway, Scotland
Operator in REPDCommunity Windpower
Elexon lead partySANQUHAR CWCL, SANQUHAR II COMMUNITY WIND CO
BM units T_SANQW-1 32 MW, T_SANQW-2 83 MW, T_SANQW-3 186 MW
Size30th largest of 163

Download and cite

Sanquhar daily output (CSV)

Every finished UK day GridMonkey has recorded for Sanquhar, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Sanquhar Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/sanquhar/ (Accessed: [date]).

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.