Minnygap wind farm

What Minnygap is generating right now, and over the last week: live from Elexon, the GB electricity market's data service.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

About Minnygap

Minnygap is an onshore wind farm in Dumfries and Galloway, Scotland, with 25 MW of registered generating capacity across one balancing mechanism unit. It is the 147th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by CK Infrastructure. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Minnygap as operational since March 2017, with 10 turbines of 2.5 MW.

Minnygap
Where Minnygap is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity25 MW
Turbines10 turbines of 2.5 MW
Operational sinceMarch 2017
LocationDumfries and Galloway, Scotland
Owner groupCK Infrastructure (operator or majority owner; joint ventures simplified)
Operator in REPDMinnygap
Elexon lead partyMinnygap Energy Limited
BM unit T_MYGPW-1 25 MW
Size147th largest of 163

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's output here is its physical notification, not metered generation. Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.