Output over the last 7 days
Limekiln since 2025: every month and year
Elexon's metered record for Limekiln's unit starts on 11 February 2025, and runs to 24 October 2026. In that time it has generated 233 GWh. Its best day was 3 January 2026, when it generated 1,999 MWh, 83 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 128 GWh | 17% |
| 2025from 11 Feb | 105 GWh | 12% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_LIMKW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Limekiln
Limekiln is an onshore wind farm in Highland, Scotland, with 106 MW of registered generating capacity across one balancing mechanism unit. It is the 56th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Boralex. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Limekiln as operational since April 2025, with turbines up to 150 m tall to the blade tip. Boralex gives it 24 turbines of 4.5 MW.
| Type | Onshore wind farm |
|---|---|
| Registered capacity | 106 MW |
| Turbines | 24 turbines of 4.5 MW (Boralex) |
| Height to blade tip | 150 m |
| Operational since | April 2025 |
| Location | Highland, Scotland |
| Owner group | Boralex (operator or majority owner; joint ventures simplified) |
| Operator in REPD | Boralex / Infinergy |
| Elexon lead party | Limekiln Extension Ltd |
| BM unit | T_LIMKW-1 106 MW |
| Size | 56th largest of 163 |
Download and cite
Every finished UK day GridMonkey has recorded for Limekiln, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Limekiln Wind Farm: Live Output and History Since 2025. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/limekiln/ (Accessed: [date]).
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2025 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.