Limekiln wind farm

Limekiln is an onshore wind farm in Highland, Scotland with 106 MW of registered capacity. In 2026 so far (to 24 Oct) it generated 128 GWh, a load factor of 17%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since February 2025.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Limekiln since 2025: every month and year

Elexon's metered record for Limekiln's unit starts on 11 February 2025, and runs to 24 October 2026. In that time it has generated 233 GWh. Its best day was 3 January 2026, when it generated 1,999 MWh, 83 MW on average.

Its average output each month, in MW. Its capacity today is 106 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Limekiln's metered output by year
YearGeneratedLoad factor
2026to 24 Oct128 GWh17%
2025from 11 Feb105 GWh12%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_LIMKW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Limekiln

Limekiln is an onshore wind farm in Highland, Scotland, with 106 MW of registered generating capacity across one balancing mechanism unit. It is the 56th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Boralex. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Limekiln as operational since April 2025, with turbines up to 150 m tall to the blade tip. Boralex gives it 24 turbines of 4.5 MW.

Limekiln
Where Limekiln is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity106 MW
Turbines24 turbines of 4.5 MW (Boralex)
Height to blade tip150 m
Operational sinceApril 2025
LocationHighland, Scotland
Owner groupBoralex (operator or majority owner; joint ventures simplified)
Operator in REPDBoralex / Infinergy
Elexon lead partyLimekiln Extension Ltd
BM unit T_LIMKW-1 106 MW
Size56th largest of 163

Download and cite

Limekiln daily output (CSV)

Every finished UK day GridMonkey has recorded for Limekiln, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Limekiln Wind Farm: Live Output and History Since 2025. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/limekiln/ (Accessed: [date]).

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2025 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.