Output over the last 7 days
Fallago Rig since 2019: every month and year
Elexon's metered record for Fallago Rig's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 2.9 TWh. Its busiest whole year was 2024, at a load factor of 34%. Its best day was 22 January 2026, when it generated 3,425 MWh, 143 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 308 GWh | 30% |
| 2025 | 375 GWh | 30% |
| 2024 | 426 GWh | 34% |
| 2023 | 370 GWh | 29% |
| 2022 | 421 GWh | 33% |
| 2021 | 331 GWh | 26% |
| 2020 | 365 GWh | 29% |
| 2019from 1 Feb | 290 GWh | 25% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_FALGW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Fallago Rig
Fallago Rig is an onshore wind farm in Borders, Scotland, with 144 MW of registered generating capacity across one balancing mechanism unit. It is the 48th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Federated Hermes. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Fallago Rig as operational since March 2013, with 48 turbines of 3 MW.
| Type | Onshore wind farm |
|---|---|
| Registered capacity | 144 MW |
| Turbines | 48 turbines of 3 MW |
| Operational since | March 2013 |
| Location | Borders, Scotland |
| Owner group | Federated Hermes (operator or majority owner; joint ventures simplified) |
| Operator in REPD | EDF Energy Renewables |
| Elexon lead party | Fallago Rig Wind Farm Limited |
| BM unit | T_FALGW-1 144 MW |
| Size | 48th largest of 163 |
Download and cite
Fallago Rig daily output (CSV)
Every finished UK day GridMonkey has recorded for Fallago Rig, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Fallago Rig Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/fallago-rig/ (Accessed: [date]).
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.