Cumberhead wind farm

Cumberhead is an onshore wind farm in Lanarkshire, Scotland with 52 MW of registered capacity. In 2025 it generated 126 GWh, a load factor of 28%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since January 2023.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Cumberhead since 2023: every month and year

Elexon's metered record for Cumberhead's unit starts on 18 January 2023, and runs to 24 October 2026. In that time it has generated 434 GWh. Its busiest whole year was 2025, at a load factor of 28%. Its best day was 12 March 2026, when it generated 1,114 MWh, 46 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 52 MW. Hover over or tap a bar for the month’s figures.
Cumberhead's metered output by year
YearGeneratedLoad factor
2026to 24 Oct99.3 GWh27%
2025126 GWh28%
2024118 GWh26%
2023from 18 Jan90.6 GWh20%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_CUMHW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Cumberhead

Cumberhead is an onshore wind farm in Lanarkshire, Scotland, with 52 MW of registered generating capacity across one balancing mechanism unit. It is the 94th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Octopus Renewables Infrastructure Trust. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Cumberhead as operational since September 2023, with 12 turbines.

Cumberhead
Where Cumberhead is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity52 MW
Turbines12 turbines
Operational sinceSeptember 2023
LocationLanarkshire, Scotland
Owner groupOctopus Renewables Infrastructure Trust (operator or majority owner; joint ventures simplified)
Operator in REPDOctopus Renewables Infrastructure Trust
Elexon lead partyUniper UK Limited
BM unit T_CUMHW-1 52 MW
Size94th largest of 163

Download and cite

Cumberhead daily output (CSV)

Every finished UK day GridMonkey has recorded for Cumberhead, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Cumberhead Wind Farm: Live Output and History Since 2023. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/cumberhead/ (Accessed: [date]).

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since January 2023 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.