Output over the last 7 days
Crossdykes since 2020: every month and year
Elexon's metered record for Crossdykes' units starts on 10 December 2020, and runs to 24 October 2026. In that time it has generated 578 GWh. Its busiest whole year was 2022, at a load factor of 27%. Its best day was 23 March 2023, when it generated 1,053 MWh, 44 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 94.6 GWh | 28% |
| 2025 | 104 GWh | 25% |
| 2024 | 92.7 GWh | 22% |
| 2023 | 104 GWh | 25% |
| 2022 | 113 GWh | 27% |
| 2021 | 68.8 GWh | 16% |
| 2020from 10 Dec | 1.3 GWh | 4% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 2 units (T_CRDEW-1, T_CRDEW-2), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Crossdykes
Crossdykes is an onshore wind farm in Dumfries and Galloway, Scotland, with 48 MW of registered generating capacity across 2 balancing mechanism units. It is the 104th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Octopus Energy Generation. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Crossdykes as operational since June 2021, with 10 turbines of 4.8 MW, up to 177 m tall to the blade tip.
| Type | Onshore wind farm |
|---|---|
| Registered capacity | 48 MW |
| Turbines | 10 turbines of 4.8 MW |
| Height to blade tip | 177 m |
| Operational since | June 2021 |
| Location | Dumfries and Galloway, Scotland |
| Owner group | Octopus Energy Generation (operator or majority owner; joint ventures simplified) |
| Operator in REPD | Muirhall Energy |
| Elexon lead party | EDF Energy Customers Limited |
| BM units | T_CRDEW-1 24 MW, T_CRDEW-2 24 MW |
| Size | 104th largest of 163 |
Download and cite
Every finished UK day GridMonkey has recorded for Crossdykes, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Crossdykes Wind Farm: Live Output and History Since 2020. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/crossdykes/ (Accessed: [date]).
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since December 2020 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.