Broken Cross wind farm

Broken Cross is an onshore wind farm in Lanarkshire, Scotland with 43 MW of capacity. In 2025 it generated 79.1 GWh, a load factor of 21%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since December 2023.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Broken Cross since 2023: every month and year

Elexon's metered record for Broken Cross' unit starts on 19 December 2023, and runs to 24 October 2026. In that time it has generated 185 GWh. Its busiest whole year was 2025, at a load factor of 21%. Its best day was 12 March 2026, when it generated 972 MWh, 41 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 43 MW. Hover over or tap a bar for the month’s figures.
Broken Cross' metered output by year
YearGeneratedLoad factor
2026to 24 Oct78.8 GWh26%
202579.1 GWh21%
202427.2 GWh7%
2023from 19 Dec9 MWh0%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_BROCW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Broken Cross

Broken Cross is an onshore wind farm in Lanarkshire, Scotland, with 43 MW of generating capacity across one balancing mechanism unit: Elexon registers it at 48 MW, but BayWa r.e. gives it 43 MW, and that is the capacity this page uses. It is the 112th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by ERG. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Broken Cross as operational since October 2024, with 10 turbines, up to 150 m tall to the blade tip.

Broken Cross
Where Broken Cross is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Capacity43 MW (BayWa r.e.)
Registered capacity48 MW (Elexon)
Turbines10 turbines
Height to blade tip150 m
Operational sinceOctober 2024
LocationLanarkshire, Scotland
Owner groupERG (operator or majority owner; joint ventures simplified)
Operator in REPDBayWa r.e. UK
Elexon lead partySmartestenergy Limited
BM unit T_BROCW-1 48 MW
Size112th largest of 163

Download and cite

Broken Cross daily output (CSV)

Every finished UK day GridMonkey has recorded for Broken Cross, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Broken Cross Wind Farm: Live Output and History Since 2023. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/broken-cross/ (Accessed: [date]).

Other ERG wind farms

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since December 2023 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.