Awaab's Law Phase 2: excess cold and excess heat join the fast-repair rules

In under two weeks, social landlords in England must deal with cold and overheating homes on the same strict timetable that already applies to damp and mould. Some of the fixes are building work, and some of that work brings in Part L.

RenoMonkey — free in your browser

Check a renovated thermal element against Part L

Renovated or replaced, RenoMonkey runs the Table 4.3 test, the 50% rule and the payback justification for the build-up you are actually proposing.

Free to check. Building Control-ready PDF £35 +VAT (£42 inc VAT).

Quick answer: Phase 2 of Awaab’s Law starts on 30 November 2026. Social landlords in England must then investigate and fix seven more hazard types on fixed deadlines where they pose a significant risk of harm. Two of them, excess cold and excess heat, are about how a home holds and loses heat. A significant hazard must be investigated within 10 working days, with safety work done within 5 working days after that and longer-term work started within 12 weeks.

What changes on 30 November

Phase 1 of Awaab’s Law has applied to the social rented sector since 27 October 2025. It covers damp and mould and emergency hazards. The Ministry of Housing, Communities and Local Government laid the Phase 2 regulations on 13 July 2026. From 30 November they add these hazards where they present a significant risk of harm:

The rules cover around 4 million social housing tenants in England. They apply to social landlords: councils and housing associations. They do not apply to private landlords.

The deadlines

The Phase 2 guidance for social landlords sets out two timetables.

Emergency hazards: investigate and complete the safety work within 24 hours of becoming aware of the hazard.

Significant hazards:

The guidance tells landlords to keep clear records of every step, and to use “appropriately qualified” staff or contractors.

What it means for cold and hot homes

The guidance gives few details on excess cold and excess heat themselves. Its examples are mostly about stop-gaps, such as portable heaters while a broken boiler is repaired. It points landlords to a separate Hazards Guidance document for more detail.

The quick fix makes a home safe. The 12-week preventative work is where the cause gets fixed, and that is where assessors and contractors come in.

Excess cold usually comes down to the fabric, the heating, or both. A cold home may need roof, wall or floor insulation, new windows, or a heating system that works. An RdSAP assessment and a site survey help show which of these is the real problem before money is spent.

Excess heat is harder. Part O covers new homes, not existing ones, but the causes are the same: large areas of unshaded glazing facing the sun, too little purge ventilation, and windows that can’t be opened safely. Our summary of the Part O overheating rules and our report on this summer’s overheating gap explain what to look for.

Where Part L comes in

Fixing excess cold often means building work. Renovating or replacing a thermal element counts as notifiable work under Part L. Re-roofing, re-rendering a wall, adding insulation to a wall, or replacing a floor can all qualify.

Once Part L applies, an element whose existing U-value is worse than the Table 4.3 threshold should be upgraded to the improved value, where that is technically, functionally and economically feasible. The 50% rule decides whether the work is large enough to count. Our guide to renovating thermal elements explains the triggers, and our renovation guide covers the wider rules.

There is a timing risk here. A landlord with a 12-week deadline cannot let a Building Control question hold the job up. It is better to know at the scoping stage whether a repair brings in the Part L upgrade.

Insulating a cold wall can also move the dew point and lead to interstitial condensation. That would swap one Awaab’s Law hazard for another, so a condensation risk analysis is worth doing before the work starts. The same pressure is growing in the private rented sector, where the Energy Independence Bill would raise the maximum MEES fine to £30,000.

What comes next

Phase 3 is planned for 2027. It will extend the rules to all remaining hazards in the Housing Health and Safety Rating System (HHSRS), except overcrowding.

If a cold-home repair involves renovating a roof, wall or floor, RenoMonkey checks the element against Table 4.3 and the 50% rule, and produces the payback justification Building Control will ask for when the full upgrade is not feasible.

Sources: Safer homes for 4m tenants with quicker action on dangerous homes (MHCLG, 13 July 2026) · Awaab’s Law Phase 2: guidance for social landlords (MHCLG) · Awaab’s Law in the social rented sector (GOV.UK collection)