South America's electricity, live

How clean is South America's power right now? Live figures from six grid operators: Brazil's, Argentina's, Uruguay's, Peru's, Ecuador's and French Guiana's. Each country's mix and carbon, Argentina's regions and the flows between them, on a map.

Checking the latest figures for South America's grids…

Carbon intensity, the grids together
– g CO₂/kWh

Loading the figures…

The countries and the lines between them, live

The map is GridMonkey's own, drawn as its Brazil map is. Each badge is a country with live figures: its mix now as a ring round its renewable share, the disc edged in the colour of its carbon (green when it is low, red when it is high). Brazil's four regions, Argentina's nine and the other countries are tinted in the same colours, each by its own carbon. The dotted lines are the flows between the regions and the countries, their dots running the way the power flows; the small dots are the regions the lines join. Hover over or tap a badge, a line or a dot for its figures.

Loading the figures…

South America in the GridMonkey app → beside Britain's map, Europe's, Australia's and the rest, and on a TV

Each country

CountryGeneratingCarbon (g CO₂/kWh)RenewableBiggest sourceReading
Loading…

The cleanest first. Each reading is its grid operator's latest, in the country's own time: the national grid's generation now, in MW (Brazil's, Argentina's and French Guiana's a few minutes old, Peru's and Ecuador's each half hour, Uruguay's about two hours behind).

Argentina's regions

RegionGeneratingCarbon (g CO₂/kWh)RenewableBiggest source
Loading…

The links between the countries

LinkFlowing nowFigure from
Loading…

Between Argentina's regions

Uruguay's power stations now

StationKindGenerating
Loading…

ADME's figures for each of Uruguay's power stations, at the same time as its national figures above: the four big hydro plants (Uruguay's half of Salto Grande, which it shares with Argentina, and the three dams on the Río Negro), then the wind, solar, biomass and thermal plants generating the most.

Where the figures come from

The carbon figure is GridMonkey's estimate (see the questions below). Renewable means hydro, wind, solar and the renewables Argentina and Ecuador give as one figure, as a share of all the power being generated; nuclear is low-carbon but not renewable, and biomass on its own isn't counted, as on GridMonkey's other maps.

Common questions

Which countries does the map show?

The six with live figures GridMonkey can read: Brazil (from ONS, its national grid operator), Argentina (CAMMESA), Uruguay (ADME), Peru (COES), Ecuador (CENACE) and French Guiana (EDF, which runs its grid). The rest are grey: Chile's grid operator publishes its generation figures hours late, Colombia's publishes live demand only, Bolivia's can't be read reliably from outside the country, and Paraguay, Venezuela, Guyana and Suriname publish no live figures GridMonkey could find.

Why are the countries at different times?

Each grid operator publishes at its own pace, and the map shows each country's latest reading in its own time. Argentina's and French Guiana's come every 5 minutes, a few minutes behind; Brazil's every minute; Peru's and Ecuador's each half hour; Uruguay's every 10 minutes but about two hours behind, as ADME publishes them. A badge is dashed, and the panel says so, when a country's reading is later than usual, and a country whose figures stop for hours goes grey until they come back.

How is the carbon figure worked out?

It is GridMonkey's estimate, made as its other maps' are: each source's output times the factor Britain's grid operator, NESO, uses for its fuel (gas 394 g of CO₂ per kWh, coal 937, oil 935, biomass 120; hydro, wind, solar and nuclear 0), divided by everything generated. Where an operator gives its thermal plants as one figure, GridMonkey counts it at their fuels' mix: Argentina's at 435 g/kWh (Ember's figures for October 2025 to September 2026: gas 49% of all its generation, coal and oil about 2% each); Ecuador's at the day's own split between fuel oil and diesel and natural gas, from CENACE's energy figures (about 880 g/kWh on 12 November 2026); Brazil's at each region's thermal plants' average over the past year, as on GridMonkey's Brazil page. Uruguay's thermal plants and French Guiana's engines and turbines burn oil. None of the operators publishes a live carbon figure.

What are Argentina’s regions?

CAMMESA, which runs Argentina's wholesale market and dispatch, reports the national grid (the SADI) in nine regions: the North-west (Jujuy, Salta, Tucumán, Catamarca, Santiago del Estero and La Rioja), the North-east (Misiones, Corrientes, Chaco and Formosa), Litoral (Santa Fe and Entre Ríos), the Centre (Córdoba and San Luis), Cuyo (Mendoza and San Juan), Greater Buenos Aires (the city and its suburbs), Buenos Aires (the rest of the province), Comahue (Neuquén, Río Negro and La Pampa) and Patagonia (Chubut and Santa Cruz). Tierra del Fuego isn't on the national grid. The regions' figures add up to a little less than the national one, as CAMMESA doesn't place all of it in a region: the badge and the tables use the national figure.

What do the lines show?

The flows the operators report: between Brazil's four regions (ONS's lines, as on the Brazil page), between Argentina's regions (CAMMESA's corridors) and between the countries (ONS's figures for Brazil's links to Argentina, Uruguay and Paraguay; CAMMESA's for Argentina's to Uruguay, Paraguay, Chile and Bolivia). The dots run the way the power flows, faster the more there is; a grey dotted line has little or no flow. Brazil's grid runs at 60 Hz and its neighbours' at 50 Hz, so its links abroad go through frequency converters, which carry little most of the time.

What is “other renewables”?

Argentina's and Ecuador's operators give some of their renewables as one figure: CAMMESA's covers Argentina's wind and solar farms, small hydro plants and bioenergy, and CENACE's Ecuador's non-conventional renewables (biomass, wind and solar). GridMonkey counts it as renewable and at 0 g of CO₂, though a little of it is biomass. The big hydro plants are counted apart, as hydro.

More GridMonkey

Data: ONS (Operador Nacional do Sistema Elétrico, ons.org.br); CAMMESA (Compañía Administradora del Mercado Mayorista Eléctrico, cammesa.com); ADME (Administración del Mercado Eléctrico, adme.com.uy); COES (Comité de Operación Económica del Sistema Interconectado Nacional, coes.org.pe); CENACE (Operador Nacional de Electricidad, cenace.gob.ec); EDF in French Guiana (opendata-guyane.edf.fr, Licence Ouverte 2.0). Argentina's thermal factor from Ember's figures for its generation by fuel. Emission factors: NESO's, as GridMonkey's Europe map uses them. Outlines: Natural Earth (public domain).

Britain's grid, live

GridMonkey started with Great Britain: its live mix, carbon and forecast, every power station and wind farm, and the cables to Europe. Free, no sign-up.