Brazil's electricity, live

Where does Brazil's power come from right now, and how clean is it? ONS's live figures for the national grid: the mix, carbon and renewable share, each of its four regions, the flows between them and abroad, and Itaipu, on a map.

Checking ONS's latest figures for Brazil's grid…

Carbon intensity now
– g CO₂/kWh

Loading the figures…

The regions and the lines between them, live

The map is GridMonkey's own, drawn as its maps of Australia and Ontario are. Each badge is one of the four regions ONS runs Brazil's grid as: its mix now as a ring round its renewable share, the disc edged in the colour of its carbon (green when it is low, red when it is high). The dotted lines are the flows between the regions and to Argentina, Uruguay and Paraguay, their dots running the way the power flows; the small dot is ONS's junction of the North-South lines, and the blue one Itaipu. Hover over or tap a badge, a line or a dot for its figures.

Loading the figures…

Brazil in the GridMonkey app → beside Britain's map, Europe's, Australia's, New Zealand's, Taiwan's and Ontario's, and on a TV

Brazil's mix by source

SourceGenerating nowShare
Loading…

ONS's figures for the national grid, the SIN: the power each source is generating now, in MW, a minute's reading. Rooftop and small solar is ONS's own estimate. Thermal is every gas, coal, oil and biomass plant ONS runs, together.

Each region

RegionGeneratingDemandCarbon (g CO₂/kWh)RenewableWith the rest
Loading…

The lines between the regions, and abroad

LineFlowing now
Loading…

Where the figures come from

The figures are ONS's live energy balance (Balanço de Energia), from the Operador Nacional do Sistema Elétrico, which runs Brazil's national grid: each region's generation by source, its demand and what it sends to or takes from the others, a minute's reading, about 2 to 3 minutes behind. GridMonkey reads it every 5 minutes. The carbon figure is GridMonkey's estimate (see the questions below), with each region's thermal factor worked out from ONS's open data for each plant over the 12 months to October 2026.

Renewable means hydro (Itaipu's too), wind, the solar farms and rooftop and small solar, as a share of all the power being generated; nuclear is low-carbon but not renewable, and the biomass among the thermal plants isn't split out, so it isn't counted.

Common questions

Where does Brazil's electricity come from?

Mostly from water. Over the year to October 2026, by ONS's figures for each plant, hydro made 58% of the power on Brazil's national grid (Itaipu's among it), wind 15% (most of it in the North-east), rooftop and small solar about 9.5% (ONS's estimate), solar farms 5%, thermal plants 10% (gas most of it, then small multi-fuel plants, coal, industrial residues and biomass) and nuclear 2% (Angra, in the state of Rio de Janeiro). How much each gives changes with the rains: in a dry season more of the thermal plants run, and the carbon figure rises.

What are the four regions?

ONS, the Operador Nacional do Sistema Elétrico, runs Brazil's national grid, the SIN, as four subsystems joined by long high-voltage lines. The North (Pará, Amapá, Amazonas, Roraima, joined to the grid in September 2025, Tocantins and Maranhão) has the big Amazon dams, Belo Monte and Tucuruí among them, and the gas plants round Manaus. The North-east (from Piauí to Bahia) has most of Brazil's wind and solar farms. The South-east and Centre-west (São Paulo, Rio de Janeiro, Minas Gerais, Espírito Santo and the states west to Acre and Rondônia) has most of the demand and most of the hydro, takes Itaipu's power and has the Angra nuclear plant. The South (Paraná, Santa Catarina and Rio Grande do Sul) has hydro and most of the coal plants. A few places in the Amazon run on their own systems, off the national grid, and aren't in ONS's figures.

How is the carbon figure worked out?

It is GridMonkey's estimate, made as its Europe map's are: each source's output times the factor Britain's grid operator, NESO, uses for its fuel, divided by everything generated (hydro, wind, solar and nuclear count as 0). ONS's live figures give thermal power as one figure, not split by fuel, so GridMonkey counts each region's at its own thermal plants' average over the 12 months to October 2026, from ONS's open data for each plant: 832 g of CO₂ per kWh in the South, where most of it is coal, 483 in the North-east, 398 in the North and 342 in the South-east and Centre-west, where it is mostly gas (gas counted at 394 g/kWh, coal 937, oil 935, biomass 120, and industrial residues and the small multi-fuel plants at NESO's 300 for other fuels). ONS publishes no live carbon figure.

What is “rooftop and small solar”?

Brazil has tens of gigawatts of solar panels on roofs and in small solar parks connected to local networks, what Brazil calls micro and mini distributed generation (MMGD). Their output isn't metered live, so since April 2023 ONS has added its own estimate of it to the live figures, to the generation and to the demand it meets. GridMonkey shows it apart from the solar farms on the national grid, and counts both as renewable.

What do the lines show?

The flows ONS reports between the regions: the South's line to the South-east, the South-east's to the North-east, and the North-South lines, whose flows ONS gives at a junction at Imperatriz, in Maranhão, where the lines from the North, the North-east and the South-east meet. The dots run the way the power flows: at night the North-east's wind often sends gigawatts south. Abroad, Brazil's grid runs at 60 Hz and Argentina's, Uruguay's and Paraguay's at 50 Hz, so each link goes through a frequency converter: Argentina's at Garabi and Uruguaiana, Uruguay's at Rivera and Melo, Paraguay's at Acaray, across the Paraná from Foz do Iguaçu. They carry little most of the time.

What is Itaipu?

Itaipu, on the Paraná between Brazil and Paraguay, is one of the biggest hydro plants in the world: 14,000 MW in 20 units, half of them at Paraguay's 50 Hz and half at Brazil's 60 Hz. Each country owns half of it; Paraguay uses only part of its half and sells the rest to Brazil, so ONS's figures give Itaipu's output into Brazil as its 60 Hz half and what Brazil takes of the 50 Hz half. GridMonkey shows it apart from the rest of the hydro, in the South-east and Centre-west's figures, where ONS counts it.

More GridMonkey

Data: ONS (Operador Nacional do Sistema Elétrico): its live energy balance, from ons.org.br, and its open data on generation by plant (dados.ons.org.br, CC BY 4.0), for the thermal factors. Emission factors: NESO's, as GridMonkey's Europe map uses them. Outlines: Natural Earth (public domain).

Britain's grid, live

GridMonkey started with Great Britain: its live mix, carbon and forecast, every power station and wind farm, and the cables to Europe. Free, no sign-up.