Pieces into Place: Future Homes Hub sets out a simpler route to adopting SuDS, roads and open space

Commissioned by MHCLG as part of its work on private estate management, the Future Homes Hub's new report recommends fixed timelines for adoption agreements, a national standard for adoptable SuDS and a stewardship strategy that runs from pre-planning to handover.

Quick answer: On 24 November 2026 the Future Homes Hub published “Pieces into Place”, a set of recommendations on how roads, sewers, SuDS and open space on new housing developments are adopted and looked after. It was commissioned by MHCLG as part of its consultation on reducing the prevalence of private estate management arrangements. Its main proposals include maximum timelines for Section 38 and Section 104 agreements, a national baseline specification for adopted assets (starting with roads, sewers, drains and SuDS), and a Stewardship Strategy with a maintenance cost estimate covering at least 30 years. These are recommendations to government. Nothing has changed in law or policy yet.

Why adoption matters

On many new estates the roads, drainage, SuDS features and green space are never adopted by the council, highway authority or water company. They are left with a private management company, and residents pay estate charges for them. The government has been consulting on how to reduce this.

For developers, adoption is often the slowest and least predictable part of finishing a site. Requirements agreed at planning can be re-opened at technical approval, and SuDS features in particular are often refused for adoption, or come with large commuted sums.

The Hub held three workshops between February and April 2026 with housebuilders, water companies, councils, housing associations and industry bodies. The report says it “does not argue for universal local authority adoption”, and does not treat private management as inherently worse.

The recommendations

The report groups its proposals under five priorities.

1. Joined-up policy and council capacity. A national dialogue between planning, highways, drainage and green space policy, because the report finds contradictions between the NPPF design policy, LTN 1/20, SuDS guidance and active travel requirements. In the nearer term, it suggests building adoptability into the revision of Manual for Streets. Within councils, planning and technical approval teams should agree adoption requirements before consent, with a presumption of technical acceptance at adoption unless standards or site conditions have materially changed. It also recommends maximum timelines for Section 38, Section 104 and equivalent agreements, phased in.

2. Consistent information and standards. A staged information standard for non-residential assets, starting with highways and drainage. Then a national baseline specification for adopted assets, with priority given to roads, sewers, drains and SuDS. The report notes that “SuDS standards already exist but are inconsistently applied”, and points to Sewers for Adoption as a model.

3. Clear approach, costs and responsibility. A short Stewardship Strategy that develops from pre-planning to handover, intended as design guidance rather than a new mandatory planning document. It would include a colour-coded plan showing what is adopted and what is privately managed, and a maintenance cost estimate of at least the first 30 years, ideally including major replacements such as drainage. AECOM is developing a SuDS costing example. Buyers would receive a Stewardship Guide explaining what they will pay for and how to complain.

4. Sound finances. A review of how councils calculate commuted sums and bonds, which the report says can make adopting nature-based assets and biodiversity net gain features “financially unworkable”. It also calls for reviews of mandatory sinking funds, long-term maintenance funding and minimum defects liability periods before handover.

5. Transparency and redress for residents. Regulation of managing agents, New Homes Ombudsman cover for estate management, clear redress routes for each asset, and a “How to buy on a freehold estate” guide.

What it means for drainage design

This is a stakeholder report, not a government position, and the Hub has given no date for a government response. But it points in the same direction as recent policy. The 2026 NPPF already makes Defra’s National Standards for SuDS the reference point, and the Environment Agency’s SuDS Strategy Templates standardise how drainage strategies are submitted. A national adoption specification would be the next step.

For developers and drainage designers, the practical message is to design SuDS with adoption and long-term maintenance in mind from the start. Agree with the adopting body early who will own each feature, keep the design evidence (including infiltration testing to BRE Digest 365 where soakaways are used), and expect future planning and sales processes to ask for the long-term maintenance cost.

Designing infiltration SuDS for a new site? SoakMonkey sizes soakaways to BRE Digest 365 from your percolation test results, or contact us for help with a drainage strategy.

Sources: Future Homes Hub, “Pieces into Place”, 24 November 2026; full report (PDF).

Got a project this affects?

Send us the drawings and the dates and we'll tell you which version applies, what it means for your specification, and what it costs to sort.