First time here? Five steps, but only two decide the answer: the area draining in, and your percolation test. Every box has an i beside it telling you what the number is and where to get it.

1 Project details

2 Drained area & rainfall

Where do these rainfall numbers come from?

Area is whatever impermeable surface actually drains to this soakaway — roof plus hardstanding, measured on plan. BRE 365 assumes 100% run-off, so there is no coefficient to apply.

The quickest route to the rainfall figures is the region quick-pick below. It sets the ratio r and the growth-factor region together, and for most domestic jobs that is what gets submitted. Replace them only if you hold site-specific FSR or FEH data.

The climate-change uplift is the number people argue about. 0% is BRE 365 as published; 40% is what most lead local flood authorities now expect. Get it from the drainage condition or the LLFA rather than assuming.

Return period. Leave it at 1 in 10 year for Building Regulations — that is BRE Digest 365’s design storm. Pick 1 in 100 year when a planning condition or the lead local flood authority asks for the soakaway to hold the 1 in 100 year storm: the tool then uses the 100-year growth factors from Table 2 of BRE Digest 365 (2016), and the climate-change uplift should be the authority’s figure.

FSR or FEH? FSR is BRE 365’s own rainfall and is what most domestic Building Control submissions use. If the lead local flood authority wants FEH rainfall, switch Rainfall data to FEH and type in the site’s depths for each storm duration from the FEH Web Service — the tool runs the same volume balance on them.

BRE 365’s own rainfall — what most domestic submissions use
100% run-off assumed (BRE 365)
Sets Z2 growth factor
M5-60 ÷ M5-2day, 0.12–0.45
= 20 mm anywhere in UK (BRE 365)
BRE 365 design storm (Part H)
0 = BRE base; 40% typical SuDS allowance

3 Soil infiltration rate — percolation test (BRE 365)

Fill a trial pit and let it drain three times. Record the time for the water level to fall from 75% to 25% effective depth. The tool computes f for each test and adopts the lowest value for design, per BRE 365. f = V₇₅₋₂₅ ÷ (ap50 × t₇₅₋₂₅)

I have not done a percolation test — can I estimate?

No. This is the one number the tool cannot supply and a soil map cannot either. Building Control will ask for the test record, and a soakaway designed on an assumed rate is the most common reason one has to be dug up again.

The test itself is simple: dig a trial pit, fill it, and time the fall from 75% to 25% of the effective depth. Repeat three times — the first fill wets the soil up and flatters the answer, which is exactly why BRE asks for three. The tool takes the lowest rate of the set.

Standing over the pit now? Use the stopwatch button — it times the fall and fills the box in. The app installs and works offline for that reason.

Test
Fall 75%→25% time (min)
or: mm fallen
over (min)
f (m/s)

4 Soakaway form & dimensions

Which form should I pick, and what do I fix?

You fix the dimensions the site decides, and the tool solves the one left over.

  • Filled granular pit — traditional, cheap, void ratio about 0.30, so the hole is roughly three times the storage.
  • Modular crates — void ratio about 0.95, a far smaller dig for the same storage. Use the manufacturer’s figure.
  • Perforated rings — the tool also checks the pit can physically contain the rings; if not you get RING TOO SMALL.
  • Trench — long and shallow, useful on a tight plot, and often empties faster because it is all side area.

Deeper is not automatically better. Water soaks out through the sides; the base is ignored because it silts up. A wider, shallower soakaway usually passes the 24-hour check more easily than a deep narrow one.

5 Result

How do I read this result?

Two things have to be true: the soakaway must hold the critical storm, and it must half-empty within 24 hours so it is ready for the next one. The second is what usually fails.

  • DESIGN OK — both satisfied.
  • FAILS 24h — it holds the storm but drains too slowly. Go wider and shallower to buy side area, or accept the ground is too tight for a soakaway.
  • CHECK GEOMETRY — a dimension is outside a physically meaningful range, or the solve went negative.
  • RING TOO SMALL — the rings cannot hold the volume even in the smallest pit that fits them.

BRE 365 sizes the soakaway; it does not site it. Keep it at least 5 m from foundations and above the water table, run paved areas through an interceptor first, and, on a 1 in 10 year design, manage the 1-in-100-year exceedance within the site boundary.

Required storage S—
Design dimension—
Critical storm—
Half-empty time—

Free to use on screen. See an example report

Storm duration analysis (1 in 10 year + 40% CC)

Duration DZ1M5-D (mm)Z2Design R (mm)Inflow I (m³)Outflow O (m³)Req. dimensionStorage (m³)

Highlighted row = critical (largest) storm. Method: BRE Digest 365 (1991, rev. 2016) volume balance I − O = S, with FSR rainfall ratios. The base of the soakaway is excluded from the infiltration area (assumed to silt up).

About this tool & BRE Digest 365

A soakaway must store storm run-off and let it infiltrate fast enough to be ready for the next storm. BRE Digest 365 sizes it by balancing inflow from the drained area against outflow into the soil across a range of 1-in-10-year storm durations, taking the worst case — or 1-in-100-year storms, when a planning condition or the lead local flood authority asks for them. The rainfall comes from BRE 365’s FSR tables, or from the site’s own FEH depths if you enter them. This tool implements that method exactly, adds an optional climate-change uplift, and checks the soakaway half-empties within 24 hours. A site percolation (soakage) test is required — never design from assumed soil rates. Soakaways should sit at least 5 m from foundations and above the water table. For paved areas, run-off should pass an oil interceptor first. On a 1-in-10-year design, the 1-in-100-year + climate-change exceedance event must be managed within the site boundary — or pick 1 in 100 year in step 2 and size the soakaway to hold it. For a Welsh SAB application or a Scottish building warrant, pick the site in step 1: the checks and the report switch to those rules.

Energycount Limited · SoakMonkey · Implements BRE Digest 365 · Not a substitute for site-specific engineering judgement