WEBVTT
Kind: captions
Language: en-GB

NOTE
This clip has no narration. These captions describe what happens on screen,
second by second, so the video is usable without sound and its content is
readable as text. Written from frames extracted from the MP4 itself.

nutrient-neutrality-calculator-1
00:00:00.000 --> 00:00:03.000
NutrientMonkey opens on Natural England’s nutrient budget methodology, running entirely in the browser. Catchment: Poole Harbour SPA / Ramsar. Nutrient assessed: nitrogen.

nutrient-neutrality-calculator-2
00:00:03.000 --> 00:00:07.000
The “Example” button is used to load a worked scheme.

nutrient-neutrality-calculator-3
00:00:07.000 --> 00:00:08.000
A toast confirms it: a 4-dwelling scheme in the Poole Harbour SPA / Ramsar catchment, “Land at Meadow Lane”, Dorset Council, planning ref EC-DEMO-NN.

nutrient-neutrality-calculator-4
00:00:08.000 --> 00:00:11.000
The waste-water worksheet fills in: 4 dwellings, occupancy 2.4 people per dwelling, Building Regs minimum 125 l/p/d, mains sewer to waste water treatment, a 20 mg/l TN current permit and 10 mg/l after 2030.

nutrient-neutrality-calculator-5
00:00:11.000 --> 00:00:15.000
The dwelling count is changed — 4, then 6, then 8 — and the header budget updates live with every keystroke: 11.22, then 16.99, then 22.57 kg N per year.

nutrient-neutrality-calculator-6
00:00:15.000 --> 00:00:19.000
The nutrient budget and credits worksheet: waste water pre-2030 18.92, current land use 0.96, future land use 0.85, SuDS removal 0.00. Budget pre-2030 22.57 and post-2030 11.22, so nitrogen mitigation required = 22.57 credits, permanent total.

nutrient-neutrality-calculator-7
00:00:19.000 --> 00:00:22.550
Closing card — NutrientMonkey, the free nutrient neutrality calculator, all 27 catchments, nitrogen and phosphorus.

